Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#20
![]() |
|||
|
|||
![]()
On Sat, 20 Aug 2005 11:44:40 +0000, Neil Williams wrote:
On Sat, 20 Aug 2005 11:39:22 +0100, steve wrote: If we are talking about closing the bank section of the Northern Line again then quite rightly given last time they closed it for several months. I am proposing, quite seriously, the idea of closing a complete line at a time (with suitable bus replacement services feeding other lines via areas of as low traffic congestion as feasible) and completely renewing all of the tired infrastructure, which would result in a reduced maintenance requirement for years to come. The idea would be to bring the infrastructure up to the superb standard of, say, the Hamburg system. New track, new signals, new cabling, the lot. A bit of short term pain for a *lot* of long-term gain, both financial and in terms of fewer blockades. Heard the shot term gain before, now the section that was closed needs replacing. Neil |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Withnail & I & The Chocolate Factory | London Transport | |||
F&*&%^& toilets | London Transport | |||
New online "Single fare finder" for Tube & DLR | London Transport | |||
Oyster & tube .. not scanning in | London Transport | |||
Heathrow & Piccadilly Tube Question | London Transport |