Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#21
![]() |
|||
|
|||
![]() "Joe Patrick" wrote in message . .. From April 2006... http://www.railwaysonline.co.uk/news/news.asp?story=276 Great, they're going to open an interchange at Blackfriars, and connect it to the main line at Vauxhall and Moorgate!!!!111one11improvement1112 Oh, wait, no they're not, are they? BTN |
#22
![]() |
|||
|
|||
![]()
On Thu, 29 Sep 2005 15:52:53 +0100, "John Rowland"
wrote: Do not 'mind the gap' anymore, perhaps? I don't think the platforms on the W&C are curved and gappy anyway. I suspect they mean level access ... So it's an up-and-down gap then :-) |
#23
![]() |
|||
|
|||
![]() |
#24
![]() |
|||
|
|||
![]()
snip
or where the 2 min journey time decrease is less relevant. It's very relevant on a line with only five trains, because you can run more journeys with the existing stock. How are they going to achieve 2 minutes compared with the current 4? snip -- Richard J. (to e-mail me, swap uk and yon in address) From my understanding its not a exact decrease in journey time obviously you can't cut an approximately 4-5min journey by 2min. What it is talking about is journey time capability (JTC) which is a theoretical number which comes out the end of a stats formula based on the it takes to get between two places and takes into account things like door opening and closing times and real journey time. Andrew |
#25
![]() |
|||
|
|||
![]()
Andy wrote:
snip or where the 2 min journey time decrease is less relevant. It's very relevant on a line with only five trains, because you can run more journeys with the existing stock. How are they going to achieve 2 minutes compared with the current 4? snip -- Richard J. (to e-mail me, swap uk and yon in address) From my understanding its not a exact decrease in journey time obviously you can't cut an approximately 4-5min journey by 2min. What it is talking about is journey time capability (JTC) which is a theoretical number which comes out the end of a stats formula based on the it takes to get between two places and takes into account things like door opening and closing times and real journey time. Andrew I've read that three times and still don't understand it. If JTC takes into account real journey times plus door opening and closing times, it sounds realistic to me, rather than theoretical. Where do statistics come into this? And my question remains unanswered: how are they going to achieve 2 minutes instead of 4? -- Richard J. (to e-mail me, swap uk and yon in address) |
#26
![]() |
|||
|
|||
![]()
On Thu, 29 Sep 2005 21:51:32 +0100, Tom Anderson
wrote: On Thu, 29 Sep 2005 wrote: said: . improved platform train interface What on earth does this mean in plain English? Passengers. They're all going to be replaced. They were replaced by customers years ago... -- James Farrar . @gmail.com |
#27
![]() |
|||
|
|||
![]()
In message , at 22:14:55 on Wed,
28 Sep 2005, John Rowland remarked: The trains are so little used in comparison to other lines they hardly need livery change Maybe they will be part of the Central Line fleet for 5 months, and this is the real reason they are receiving new livery. How will they teleport them between the two lines? -- Roland Perry |
#28
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message , at 22:14:55 on Wed, 28 Sep 2005, John Rowland remarked: The trains are so little used in comparison to other lines they hardly need livery change Maybe they will be part of the Central Line fleet for 5 months, and this is the real reason they are receiving new livery. How will they teleport them between the two lines? Perhaps with a smidgin of enterprise? |
#29
![]() |
|||
|
|||
![]()
In message , at
07:41:09 on Fri, 30 Sep 2005, Brimstone remarked: How will they teleport them between the two lines? Perhaps with a smidgin of enterprise? Craning them out one car at a time, then transporting them by road to wherever the nearest Central line depot is; then doing the reverse five months later really doesn't seem worth while. Especially given that the specification and modification level of the cars on the two lines has diverged over the years - so they probably wouldn't work anyway. -- Roland Perry |
#30
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message , at 07:41:09 on Fri, 30 Sep 2005, Brimstone remarked: How will they teleport them between the two lines? Perhaps with a smidgin of enterprise? Craning them out one car at a time, then transporting them by road to wherever the nearest Central line depot is; then doing the reverse five months later really doesn't seem worth while. Especially given that the specification and modification level of the cars on the two lines has diverged over the years - so they probably wouldn't work anyway. Perhaps if I had written it as "Enterprise" it might have got a better response? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tower Bridge To Close For 3 Months | London Transport | |||
Waterloo & City line crane operation this weekend... | London Transport | |||
Waterloo & City line | London Transport | |||
Waterloo & City Line Car Lift Operation | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport |