Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#41
![]() |
|||
|
|||
![]()
In message , Andy
writes Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain. ![]() Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. -- Clive |
#42
![]() |
|||
|
|||
![]() |
#43
![]() |
|||
|
|||
![]()
On Sat, 1 Oct 2005 01:06:24 +0100, Clive
wrote: In message , Andy writes Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain. ![]() Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. There always was a way out but they built Waterloo International on top of it. -- James Farrar . @gmail.com |
#44
![]() |
|||
|
|||
![]()
In message ,
Colin Rosenstiel writes They used to have a lift but it disappeared under the Eurostar station. Perhaps they could put it back in 2007. That's the old way. What's wrong with a ramp? Or a direct connection to a tube line at either Waterloo or bank. The rest of the system is integrated with lines that connect when services are suspended, what's wrong with bringing the W&C into the 21centry. -- Clive |
#45
![]() |
|||
|
|||
![]()
Clive wrote:
In message , Colin Rosenstiel writes They used to have a lift but it disappeared under the Eurostar station. Perhaps they could put it back in 2007. That's the old way. What's wrong with a ramp? Or a direct connection to a tube line at either Waterloo or bank. The rest of the system is integrated with lines that connect when services are suspended, what's wrong with bringing the W&C into the 21centry. How about cost effectiveness? Think about the engineering involved in such a project (assuming it to be technically possible) and how much it would cost and then decide if it would be worth spending so much mony for the benefits that would be gained. |
#46
![]() |
|||
|
|||
![]()
Clive wrote:
Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. Are you going to pay for these works? -- http://gallery120232.fotopic.net/p10601020.html (91 009 arriving at Kings Cross in 1999) |
#47
![]() |
|||
|
|||
![]() |
#48
![]() |
|||
|
|||
![]()
writes:
said: . improved platform train interface What on earth does this mean in plain English? I can just about guess the other ones, but this has me really puzzled. The inverse of "mind the gap"? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tower Bridge To Close For 3 Months | London Transport | |||
Waterloo & City line crane operation this weekend... | London Transport | |||
Waterloo & City line | London Transport | |||
Waterloo & City Line Car Lift Operation | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport |