London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old September 28th 05, 04:04 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 258
Default Waterloo & City Line to Close for 5 Months

Staff Q&A Briefing note: Major Waterloo and City line closure April -
September 2006
1. What works are being carried out, what will be delivered when the
closure??
- 25% Capacity Enhancement with 5th train in peak service, leading to a
12%
journey time improvement and 30% capacity increase
- relaying of the entire running length of track and therefore improved
ride quality
- improved journey time (circa 2 minutes)
- replacement of old Network Rail engineering features
- Improved maintenance facilities (power after 2300 in depots and on
Sundays will
increase stock servicing levels and reliability levels)
- renewal of electrical and mechanical, fire protection and
communication assets
(e.g. PA equipment)
- additional measures to mitigate against water ingress and improve
drainage to the
permanent way
- heritage features will be preserved where possible
A 5 month closure will provide the following additional deliverables
· train wash relocation
· improvements to the rolling stock including redecoration, new
livery, reupholstery
and some respringing, refurbishment of grab rails, improvements to
floors and
windows.
· improved platform train interface
· opportunity to carry out superficial improvements to the platform
ambience at
Waterloo and Bank platforms
· various rolling stock improvements including re-livery,
re-upholstery, a redecoration
of the grab rails, improvements to floors and some glass being
replaced
· delivery of the centralised control system by September 2006
2. What closures will LU need?
The entire line will shut from 1 April until 31 August 2006
3. But I want to go from Waterloo to Bank in the morning and the
reverse in the
evening. What do I do?
At Waterloo you should take the Bakerloo/Northern lines to Embankment
and then any
eastbound District or Circle line to Monument.
The reverse of this route should be taken for return journeys in the
evening peak as there
is a lack of capacity on the southbound City branch of the Northern
line Bank to London
Bridge.
4. Will you provide a line of route replacement bus service?
No, because there is spare capacity on the tube lines as outlined
above. Also scheduled
buses 26 and 76 run Waterloo - Bank and vice versa
5. How will you communicate these alternatives to customers?
In advance: Pre-warning customer publicity will be released October
2005 including
poster and leaflets (which are available to hotels, tourist sites etc
on request), in-train
information and web-site updates on www.tfl.gov.uk/tube (linked to a
number of tourism
web-sites). A Press Release will be issued with the dates, backed up by
website
information.
A full communications package will be delivered including scripts for
announcements.
6. Are businesses entitled to compensation?
London Underground is not legally obliged to compensate customers or
businesses for
disruptions arising from planned engineering work.
7. Who have you consulted with?
London Transport Users Committee (LTUC) who are our main transport
watchdog body,
the Corporation of London and key business groups. They all widely
approve with the
strategy and the benefits the work will bring
8. I am part of the Waterloo and City line team, what will I do during
the five month
closure?
Station staff will continue to work for their Group Station Manager in
the same roles.
Train Operators, who are on loan from Leytonstone depot anyway, will
work on the
Central line.
The small number of signal operators and duty managers will move to
either noncustomer
facing duties, or relocated to other customer service areas depending
on their
aspirations and business needs. All staff will retain their current pay
and conditions.
9. Analysis carried out by S&SD showed that the most unsuitable line
for a
blockade style closure, in terms of customer disbenefits, is the W&C
line? Why do
the work therefore as a major closure?
The method of evaluating customer disbenefit is a fluid one, factors
such as time of year,
availability of alternative transport and the significant risk of
Monday morning delays
following the number of weekend closures that had been previously been
envisaged
were taken into account as part of LU's review of the blockade
proposal.
These were weighed up against the benefits of the additional works now
included in the
scope and the contained disruption to our customers while delivering
London a show
piece project

************************************************** ********************

No big secrets, but I can't think of a line more suited to
evening/weekend closures, or where the 2 min journey time decrease is
less relevant. Some classic "LUspeak" though - "heritage features to be
retained - EH?2 (must be the NSE finishes at Bank!) and the phrase
"show piece project". The trains are so little used in comparison to
other lines they hardly need livery change, new upholstery or changed
window glass - why not do something about the window etching endemic on
the other lines run by Metronet?

  #4   Report Post  
Old September 28th 05, 05:16 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 349
Default Waterloo & City Line to Close for 5 Months

What is that over-capacity on the Northern Line they are talking
about?!

Maybe wisely they did not mention the other way of getting from
Waterloo to Bank - th 521 bus which usually has 3 parallel queues at
Waterloo in the morning that snake their way right the way down into
the pit through which one has to walk en route from the mainline
station or, for the 3rd (rearmost) queue, which snakes right the way
into whatever the road is called where the Southbound 521s terminate. I
would estimate that well over 600 people are in those queues at any one
time in the morning peaks.

ANY reduction in capacity elsewhere, such as the entire closure of the
W&C will only exacerbate an already dire situation.

Marc.

  #6   Report Post  
Old September 29th 05, 08:35 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Waterloo & City Line to Close for 5 Months

asdf wrote:
(snip)
And what about "replacement of old Network Rail engineering features"!
A bit of airbushing of history going on there...


And it's somewhat confusing to even bring Network Rail into the
picture, as LU took over the line directly from British Rail in 1994.
Network Rail has thus never had custody of the line.

Looking at CULG, it's intriguing to note that within LU, the W&C line
has been under Central Line management, then Bakerloo line management,
and then East London Line management. When the East London Line ceases
to be an LU operation then the W&C will need yet another new management
home. I wonder what the reason is for all these changes.

  #7   Report Post  
Old September 29th 05, 10:02 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 1,150
Default Waterloo & City Line to Close for 5 Months

On 29 Sep 2005 01:35:18 -0700, "Mizter T" wrote:

And what about "replacement of old Network Rail engineering features"!
A bit of airbushing of history going on there...


And it's somewhat confusing to even bring Network Rail into the
picture, as LU took over the line directly from British Rail in 1994.
Network Rail has thus never had custody of the line.


That was rather my point...

Still, at least if they set their targets low, we won't be
disappointed. Replacing every piece of former Network Rail
infrastructure on the line shouldn't be too hard...
  #8   Report Post  
Old September 29th 05, 10:10 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2004
Posts: 235
Default Waterloo & City Line to Close for 5 Months

Mizter T wrote:

asdf wrote:
(snip)
And what about "replacement of old Network Rail engineering features"!
A bit of airbushing of history going on there...


And it's somewhat confusing to even bring Network Rail into the
picture, as LU took over the line directly from British Rail in 1994.
Network Rail has thus never had custody of the line.


.... and there were never any Romans in York, Chester or London ...
--
A picture recently added to my gallery collection:
http://gallery120232.fotopic.net/p13624510.html
(PKP Ok1-359 - smoking and steaming away at Wolsztyn, Poland, in 1999)
  #9   Report Post  
Old September 28th 05, 09:14 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,577
Default Waterloo & City Line to Close for 5 Months

wrote in message
ups.com...

The trains are so little used in comparison to
other lines they hardly need livery change


Maybe they will be part of the Central Line fleet for 5 months, and this is
the real reason they are receiving new livery.

--
John Rowland - Spamtrapped
Transport Plans for the London Area, updated 2001
http://www.geocities.com/Athens/Acro...69/tpftla.html
A man's vehicle is a symbol of his manhood.
That's why my vehicle's the Piccadilly Line -
It's the size of a county and it comes every two and a half minutes



  #10   Report Post  
Old September 30th 05, 06:42 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Waterloo & City Line to Close for 5 Months

In message , at 22:14:55 on Wed,
28 Sep 2005, John Rowland
remarked:
The trains are so little used in comparison to
other lines they hardly need livery change


Maybe they will be part of the Central Line fleet for 5 months, and this is
the real reason they are receiving new livery.


How will they teleport them between the two lines?
--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tower Bridge To Close For 3 Months Robin9 London Transport 6 September 30th 16 09:09 AM
Waterloo & City line crane operation this weekend... Mizter T London Transport 14 August 8th 06 05:52 PM
Waterloo & City line Jonathan Morris London Transport 2 June 5th 06 01:25 AM
Waterloo & City Line Car Lift Operation JMUpton2000 London Transport 21 April 7th 06 07:29 PM
LU to close Waterloo&City line to save money. [email protected] London Transport 1 August 29th 03 05:13 PM


All times are GMT. The time now is 03:31 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017