London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Report Post  
Old September 29th 05, 03:42 PM posted to uk.transport.london
 
Posts: n/a
Default Waterloo & City Line to Close for 5 Months

Laurence Payne said:

On Thu, 29 Sep 2005 15:02:44 +0100, wrote:

said:

. improved platform train interface


What on earth does this mean in plain English? I can just about
guess the other ones, but this has me really puzzled.


You won't have to Mind The Gap :-)


Thanks.



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tower Bridge To Close For 3 Months Robin9 London Transport 6 September 30th 16 09:09 AM
Waterloo & City line crane operation this weekend... Mizter T London Transport 14 August 8th 06 05:52 PM
Waterloo & City line Jonathan Morris London Transport 2 June 5th 06 01:25 AM
Waterloo & City Line Car Lift Operation JMUpton2000 London Transport 21 April 7th 06 07:29 PM
LU to close Waterloo&City line to save money. [email protected] London Transport 1 August 29th 03 05:13 PM


All times are GMT. The time now is 03:32 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017