London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10   Report Post  
Old September 29th 05, 05:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2005
Posts: 232
Default Waterloo & City Line to Close for 5 Months

On Thu, 29 Sep 2005 15:52:53 +0100, "John Rowland"
wrote:

Do not 'mind the gap' anymore, perhaps?


I don't think the platforms on the W&C are curved and gappy anyway. I
suspect they mean level access ...


So it's an up-and-down gap then :-)


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tower Bridge To Close For 3 Months Robin9 London Transport 6 September 30th 16 09:09 AM
Waterloo & City line crane operation this weekend... Mizter T London Transport 14 August 8th 06 05:52 PM
Waterloo & City line Jonathan Morris London Transport 2 June 5th 06 01:25 AM
Waterloo & City Line Car Lift Operation JMUpton2000 London Transport 21 April 7th 06 07:29 PM
LU to close Waterloo&City line to save money. [email protected] London Transport 1 August 29th 03 05:13 PM


All times are GMT. The time now is 10:22 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017