#21
![]() |
|||
|
|||
![]()
In message , Roland
Perry writes There are many places on roads where NSL applies, and upon which you can encounter isolated junctions with street lighting (it often happens where an unlit bypass has a junction with the "old" road through a village). But they rarely trigger an automatic 30mph limit for that short stretch of the road. That's an aspect which still has me confused, and I've seen a good many more of these recently. I agree that they are rarely marked with explicit 30 mph limits, but if there are two or more street lights with less than 200 yards separating them, doesn't that mean that they automatically impose a 30 mph limit? It sounds as if you think not, but I'd be grateful for a fuller explanation of why you think that. -- Clive Page |
#22
![]() |
|||
|
|||
![]()
nRoland Perry typed:
In message , at 21:33:43 on Mon, 28 Nov 2005, Richard J. remarked: So there is the possibility of stretches of 599m of lit road where the limit is still NSL, without any repeaters being required. But the guidelines do say that for lit stretches of 600m or more, the first and last repeaters should be not more than 450m from the start/end of the lit section, so it would be reasonable to expect at least one repeater in a lit section of more than 450m. Yes, if the lit section is more than 600m. Especially if you are new to the area, you may not know how far the lights go. No, what I mean is that it would be reasonable to apply the "first repeater within 450m" rule for lit sections of between 450 and 600m as well as for those of 600m. However, the guidance is poor in my view. I much prefer the French practice of often putting several repeater signs close together just after the start of the limit, which leaves you in no doubt what the limit is. In Britain, if you miss the initial sign, Which initial sign is that? We are mainly talking about isolated stretches of lit road (whether they be thorough a village, or merely adjacent to a junction) where there's no sign at the start of the lit section. In which case the previous limit still applies. Where the limit changes, they should sign it properly, and it stays in force until the next limit change. If there's likely to be any doubt, put in extra repeaters as necessary. But all this stuff about street lights and whether they are close enough together is not helpful. (I mean the DfT rules are unhelpful, not your discussion of them.) It's led to ludicrous rules like it being illegal to put up 30mph repeaters in a lit street unless there is a speed camera within 1km. -- Richard J. (to e-mail me, swap uk and yon in address) |
#23
![]() |
|||
|
|||
![]()
In message , at
00:16:32 on Tue, 29 Nov 2005, Richard J. remarked: So there is the possibility of stretches of 599m of lit road where the limit is still NSL, without any repeaters being required. But the guidelines do say that for lit stretches of 600m or more, the first and last repeaters should be not more than 450m from the start/end of the lit section, so it would be reasonable to expect at least one repeater in a lit section of more than 450m. Yes, if the lit section is more than 600m. Especially if you are new to the area, you may not know how far the lights go. No, what I mean is that it would be reasonable to apply the "first repeater within 450m" rule for lit sections of between 450 and 600m as well as for those of 600m. I'm not sure that a repeater 450 yards into a 500 yard lit section is every helpful. What's really needed is a repeater at the *first* lamp-post. I have no idea why this rather simple thing isn't part of the recommendations. However, the guidance is poor in my view. I much prefer the French practice of often putting several repeater signs close together just after the start of the limit, which leaves you in no doubt what the limit is. In Britain, if you miss the initial sign, Which initial sign is that? We are mainly talking about isolated stretches of lit road (whether they be thorough a village, or merely adjacent to a junction) where there's no sign at the start of the lit section. In which case the previous limit still applies. No, and this is the whole point. Where there are lights the previous limit is irrelevant, and the limit is automatically 30mph. *Except* for very short lit sections, and except when there are repeaters. But because you don't encounter the repeaters immediately, nor do you encounter the other end of the lit section immediately (so can't tell if it's "very short" or not), there is always a doubt about what the limit is until you've surveyed the stretch in advance. Where the limit changes, they should sign it properly, "Properly" seems to be defined by these recommendations about "450m" etc. I agree that it seems inadequate. and it stays in force until the next limit change. If there's likely to be any doubt, put in extra repeaters as necessary. But all this stuff about street lights and whether they are close enough together is not helpful. (I mean the DfT rules are unhelpful, not your discussion of them.) And another thing. How is the 200yds measured? Is it literally from lamp standard to lamp standard (which may be on alternate sides of the road) or is it measured along the middle of the road between perpendiculars to each lamp? It's led to ludicrous rules like it being illegal to put up 30mph repeaters in a lit street unless there is a speed camera within 1km. That's interesting. I've seen some villages in Essex with 30mph repeaters. I always thought that was because Essex took a different view on where they could be installed. I will look a bit closer at the lamp spacing next time, and see if the roads aren't in fact "lit" officially. There are no speed cameras. -- Roland Perry |
#24
![]() |
|||
|
|||
![]()
In message , at 23:30:26 on Mon, 28
Nov 2005, Clive Page remarked: In message , Roland Perry writes There are many places on roads where NSL applies, and upon which you can encounter isolated junctions with street lighting (it often happens where an unlit bypass has a junction with the "old" road through a village). But they rarely trigger an automatic 30mph limit for that short stretch of the road. That's an aspect which still has me confused, and I've seen a good many more of these recently. I agree that they are rarely marked with explicit 30 mph limits, but if there are two or more street lights with less than 200 yards separating them, doesn't that mean that they automatically impose a 30 mph limit? It sounds as if you think not, but I'd be grateful for a fuller explanation of why you think that. Looking at the rules as expressed on the ABD site - and assuming the lamps are close enough together (200yds) to make the road officially "lit": http://www.abd.org.uk/speed_limit_signs.htm If the lit section is less than 350m (and the speed limit either side is 40 or NSL), then no repeaters are required. This is difficult to unpick. However, from the general tone of the rules I believe that it's correct to assume that such a stretch of road has "missing" 40/NSL repeaters, rather than "missing" 30mph signs. Similarly if the lit section is less than 450m, and the road either side has a 50mph limit. (Very few roads have explicit 60mph limits, so let's not worry about that one). On the other hand: If the lit section of road is between 350m and 600m long, and has NSL either side, then one would expect to find a "derestricted" repeater in the first 250m. The lack of such a repeater would imply the road is 30mph. If the lit section of road is over 600m long, and has NSL either side, the first repeater must be within 450m. The lack of such a repeater would imply the road is 30mph. [And similar rules for the last two for 40mph, 50mph and 60mph roads]. -- Roland Perry |
#25
![]() |
|||
|
|||
![]()
Clive D. W. Feather wrote:
There are countdown signs on the approaches to some villages near where I live: the usual diagonal stripes with a speed limit sign above, except that the red ring is grey (presumably to stop it being a speed limit sign). When I first saw one of those combined "countdown and speed-limit" signs, I interpreted it as "there is a speed limit HERE, because there is a junction in x00 metres", not "there will be a speed limit in x00 metres" Richard [in PE12] |
#26
![]() |
|||
|
|||
![]()
Endymion Ponsonby-Withermoor III typed:
Clive D. W. Feather wrote: There are countdown signs on the approaches to some villages near where I live: the usual diagonal stripes with a speed limit sign above, except that the red ring is grey (presumably to stop it being a speed limit sign). When I first saw one of those combined "countdown and speed-limit" signs, I interpreted it as "there is a speed limit HERE, because there is a junction in x00 metres", not "there will be a speed limit in x00 metres" When countdown signs for temporary speed limits on motorways were first introduced, they had a black circle instead of a red one, which made it clear that it wasn't an immediate change of limit. But nowadays, the circles are red, which leads to the confusion you describe. I often see what appears to be a speed limit sign, and ease off my speed, and then notice that it's not for 300 yards because it's got three little stripes below it. Not a good design, I feel. -- Richard J. (to e-mail me, swap uk and yon in address) |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Time limit for Oyster PayG journey | London Transport | |||
Wood Green High Road speed limit | London Transport | |||
A13: Why the new speed limit? | London Transport | |||
Minimum speed limit sign after the dartford tunnel? | London Transport |