Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#29
![]() |
|||
|
|||
![]()
On 5 Dec 2005 15:11:04 -0800, "TheOneKEA" wrote:
The resulting service pattern is hoped to be: 4tph Richmond to Stratford 4tph Clapham Junction to Stratford 2tph Queens Park to Stratford via Primrose Hill and Camden Road 2tph Clapham Junction to Barking 6tph Queens Park to Watford Junction It's good that there's going to be through service onto the GOBLIN from the likes of Willesden Junction and West Hampstead. At the moment you have to wait around at Gospel Oak while changing trains, and worry about being stranded there for 30 mins if a train is cancelled or your NLL train is delayed and misses the connection. Throw in a reopened Primrose Hill NLR, a reopened Tufnell Park NLR, a reopened York Way NLR, Are these planned, or just wishful thinking? (Even if the latter, Primrose Hill at least seems extremely likely.) Incidentally, I've noticed that one of the Bakerloo line diagrams at Baker Street (there are probably plenty of others) is old enough to still show it going all the way to Watford Junction, with a panel covering everything north of Harrow & Wealdstone. I'm already wondering if they'll simply remove the panel, rather than performing a blanket replacement of all the diagrams on the line... |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Baker St.(Met) and Met operations | London Transport | |||
Parking at Watford Met | London Transport | |||
pcccadilly line delays Saturday 03 march | London Transport | |||
"Cassio Metro" - the new group of buildings next to Watford Met | London Transport | |||
Watford Junction.. On the Met, Via Croxley... | London Transport |