Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Has anyone else noticed that the new awning extension on platforms 2/3
at Hayes doesn't exactly fit the profile of that over the pre-existing waiting room? It protrudes by at least 3 inches. Could it be that the awning was designed using metric instead of imperial measurements? Also the new footbridge is brilliant in its design - the covered stairs on platforms 2/3 will be directly in the path of the overhead wiring supports necessitiating that the latter are moved!! This will require the complete cessation of all electric train services through the station. Also there are no disabled facilities provided on the new bridge. Yet another FGWL/Railtrack cock-up? Happy new year. CJB. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Another Suicide at Hayes & Harlington | London Transport | |||
Hayes & Harlington - Victoria/London Oyster Cards | London Transport | |||
Chaos at Hayes & Harlington - as new C.I.S. mis-informs pax | London Transport | |||
Massive Disruption at Paddington - Suicide at Hayes & Harlington | London Transport | |||
Major Upset at Hayes & Harlington | London Transport |