Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 4 Apr 2006 03:03:36 -0700, "John B" wrote:
And closure following closely no doubt. Yet another service reduction disguised as "reliability", even though for the time being there will still be through services at the busiest and potentially most problematic times. Why don't they genuinely improve reliability by doubling the track? The service is being made less attractive so that a decline in use can be given as an excuse to make more cuts, leading to more unattractiveness and further decline in use. The most reliable railway is one that runs no trains at all: none are ever late or cancelled. I don't think this is fair. It's uncontroversial among transport planning professionals that the more branches a service has, the more scope there is for it to go wrong. This is particularly pronounced in a system as complicated as the Northern Line, where minor delays in one branch have the potential to cause serious system-wide distruption once trains start arriving out of timetabled order in the wrong places. So why retain the through services at the times when the network is under the most strain of all? And why not, say, double the frequency of the shuttle, to make up for the withdrawl of through services? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail Pudding Mill Lane Portal | London Transport | |||
Streatham Hill to Tulse Hill peak hour passenger services | London Transport | |||
Pudding Mill Lane | London Transport | |||
Whatever happened to the Mill Hill East extension? | London Transport | |||
Mill Hill East | London Transport |