Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
In message , Aidan Stanger
writes . Potters Bar might be a better location, but their trains don't stop there yet. If they, or their successors, ever do start stopping their trains there, it might be worth considering extending the Jubilee Line there. But it's not going to become as important a station as Watford Junction any time in the forseeable future. Wouldn't it be easier to extend the Piccadilly there in that eventuality as it's just up the road from Cockfosters? -- Steve Fitzgerald has now left the building. You will find him in London's Docklands, E16, UK (please use the reply to address for email) |
#2
![]() |
|||
|
|||
![]()
Steve Fitzgerald ] wrote:
writes . Potters Bar might be a better location, but their trains don't stop there yet. If they, or their successors, ever do start stopping their trains there, it might be worth considering extending the Jubilee Line there. But it's not going to become as important a station as Watford Junction any time in the forseeable future. Wouldn't it be easier to extend the Piccadilly there in that eventuality as it's just up the road from Cockfosters? Yes it would. However the Piccadilly does not venture very far from the GN, so the benefits would be much lower. -- Aidan Stanger http://www.bettercrossrail.co.uk |
#3
![]() |
|||
|
|||
![]() "Aidan Stanger" wrote in message ... Steve Fitzgerald ] wrote: writes . Potters Bar might be a better location, but their trains don't stop there yet. If they, or their successors, ever do start stopping their trains there, it might be worth considering extending the Jubilee Line there. But it's not going to become as important a station as Watford Junction any time in the forseeable future. Wouldn't it be easier to extend the Piccadilly there in that eventuality as it's just up the road from Cockfosters? Yes it would. However the Piccadilly does not venture very far from the GN, so the benefits would be much lower. As somebody who grew up in Potters Bar and knows the area reasonably well, there is also the small question of engineering difficulties and overall cost. It would need some major earthworks or, more appropriately, tunnelling (there is the small geographical feature of Stag Hill to contend with.) This would be a hugely expensive project for little economic gain. It also falls outside the TfL area. You only have to look at the problems faced by the rather more practical proposal to join up the Watford branch of the Metropolitan to Watford Junction, along the former Croxley Green track bed to see the difficulties that scheme has faced, not least through the TfL/Hertfordshire CC interface and the different funding regimes. |
#4
![]() |
|||
|
|||
![]()
I think this discussion has grown out of all proportion. In the off
peak when things are not quite running to time, the line controllers will often just send the odd train in 4 to MHE, which is in effect the same service as a shuttle (15 mins). The shuttles are set up currently in times of severe disruption, but from what I can see, I don't quite grasp the reason for the mass debate? Whats the current interval off peak anyhow? The other flaw in the main arguments are a "through service", a "through service" to what exactly? Camden? Change. Bank? Change. Euston? Change. The Tube is unlike the rest of the railway where changes can be painstaking and frustrating. The tube network is a whole series of walks, transfers and interchanges. So a few dozen people at Finchley Central are left waiting an extra 2 minutes for a MHE train, whats the major deal? The notion of reducing train lengths incidentally to save costs is ridiculous in this instance because there would have to be customised rolling stock for a branch line. Commonality of fleet breeds reliable trains, fact. Anyone know whether the change is borne from TfL or a TubeLines infastructure related cost? Ian |
#5
![]() |
|||
|
|||
![]() wrote in message oups.com... Whats the current interval off peak anyhow? Between 1996 and 1998, MHE had a train every 12-15 minutes whenever the line was open. The frequency depended not on demand but on whole number intervals of the mainline headway... so at the time of night when the mainline dropped from 5 minute headways to 6, the MHE frequency went up from 15 to 12. See http://www.geocities.com/Athens/Acro....html#Northern |
#6
![]() |
|||
|
|||
![]()
wrote:
I think this discussion has grown out of all proportion. In the off peak when things are not quite running to time, the line controllers will often just send the odd train in 4 to MHE, which is in effect the same service as a shuttle (15 mins). The shuttles are set up currently in times of severe disruption, but from what I can see, I don't quite grasp the reason for the mass debate? Introducing a shuttle service is a good idea, but the way they're planning to do it isn't, and has triggered speculation about whether they're running the service down prior to closure. Whats the current interval off peak anyhow? The other flaw in the main arguments are a "through service", a "through service" to what exactly? Camden? Change. Bank? Change. Euston? Change. Only the second of those examples would require a change. The Tube is unlike the rest of the railway where changes can be painstaking and frustrating. The tube network is a whole series of walks, transfers and interchanges. So a few dozen people at Finchley Central are left waiting an extra 2 minutes for a MHE train, whats the major deal? The big deal is that they're worsening the service, whereas it would be so easy for them to improve the service. The notion of reducing train lengths incidentally to save costs is ridiculous in this instance because there would have to be customised rolling stock for a branch line. Commonality of fleet breeds reliable trains, fact. The notion that it is a ridiculous notion is itself ridiculous! Firstly it's commonality of modular components and equipment layout that gives a reliability advantage - not how far the back cab is from the front cab! Secondly, the rest of the fleet's big enough to gain a commonality advantage. Having one train different is unlikely to impact on the reliability of the rest of the fleet, even if the reliability of the train that's different is adversely affected. And thirdly, shorter trains are cheaper to maintain because there's less of them to maintain! Supposing a 2 car train was sufficiently different from the rest of the fleet that the maintenance cost per car km was doubled. That still leaves you ahead of where you'd be if you ran a 6 car train. Anyone know whether the change is borne from TfL or a TubeLines infastructure related cost? Not for certain, but it's more likely to be TfL. -- Aidan Stanger http://www.bettercrossrail.co.uk |
#7
![]() |
|||
|
|||
![]() |
#9
![]() |
|||
|
|||
![]()
The other flaw in the main arguments are a "through service", a
"through service" to what exactly? Camden? Change. Bank? Change. Euston? Change. The current through service is to Morden or Kennington. The notion of reducing train lengths incidentally to save costs is ridiculous in this instance because there would have to be customised rolling stock for a branch line. No, there wouldn't. The Northern Line trains are 3-car units, coupled in pairs to make 6-car trains. You could run a single unit as the shuttle. Except the trains are formed with UNDMs at the inner ends of the units and therefore have no driving cabs (Apart from the shunting panel, of course). 95 stock doesn't have any double ended 3 car units. -- Steve Fitzgerald has now left the building. You will find him in London's Docklands, E16, UK (please use the reply to address for email) |
#10
![]() |
|||
|
|||
![]()
Steve Fitzgerald wrote:
The other flaw in the main arguments are a "through service", a "through service" to what exactly? Camden? Change. Bank? Change. Euston? Change. The current through service is to Morden or Kennington. The notion of reducing train lengths incidentally to save costs is ridiculous in this instance because there would have to be customised rolling stock for a branch line. No, there wouldn't. The Northern Line trains are 3-car units, coupled in pairs to make 6-car trains. You could run a single unit as the shuttle. Except the trains are formed with UNDMs at the inner ends of the units and therefore have no driving cabs (Apart from the shunting panel, of course). 95 stock doesn't have any double ended 3 car units. How easy/difficult would it be to create a double-ended unit using existing cars? -- John Band john at johnband dot org www.johnband.org |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail Pudding Mill Lane Portal | London Transport | |||
Streatham Hill to Tulse Hill peak hour passenger services | London Transport | |||
Pudding Mill Lane | London Transport | |||
Whatever happened to the Mill Hill East extension? | London Transport | |||
Mill Hill East | London Transport |