Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Thu, 6 Apr 2006, Aidan Stanger wrote:
Tom Anderson wrote: On Tue, 4 Apr 2006, Aidan Stanger wrote: John B wrote: MIG wrote: Peter Smyth wrote: Mill Hill East services will be reduced to a shuttle to Finchley Central off-peak and weekends from October 2006. Yet another service reduction disguised as "reliability", If the result is to make a substantial reduction in total Misery Line misery, which it should be, then it seems like a good plan... It would be a good plan if they did it right! There's presumably room to throw in a passing loop halfway along the branch; that would cost money, but be cheaper than doubling, but would allow the frequency to be doubled, so that every mainline train could link up with a shuttle. It could if the passing loop were long, though it would be harder to coordinate the service to connect with southbound trains as well. Perhaps things could be timed so that the shuttles connect to the southbound trains in the morning, and the northbound ones in the evening. Not sure what you'd do in the middle of the day! But the biggest problem would be getting it to connect properly in the peaks when trains run more frequently than every 4 minutes. True. If they shortened the train length proportionally, it wouldn't even cost any more to run. What's the train length got to do with it? Going from 15 to 8 minutes would be done by cutting down waiting time, not running more trains, AIUI. Shorter trains use less electricity. Aha. Is that a significant cost in running a train, then? I'd never though of that. The interesting thing to consider is how the MHE branch can be made more useful in the long term. One idea I put on my website is to have it as a branch of Crossrail Line 2, and extend it to Watford Junction via MHB, Edgware and Stanmore. This would mean that nobody in North London would have to detour to Euston to catch a train to The North, Er, provided they can get to the High Barnet branch of the Northern line, No, it would interchange with the other lines as well. Where would it go south of Finchley? and they don't want the ECML or MML! If they did, they'd be detouring to Kings Cross or St.Pancras, not Euston. However there would be a stop at Mill Hill Broadway to connect with the Thameslink service, so some MML passengers would also benefit albeit not to the same extent as the WCML passengers. I suppose if this function was considered important enough, more trains could be stopped at MHB. There's no GNER equivalent of Watford Junction. Stevenage is too far out, and they couldn't get planning permission for their Hadley Wood proposals. Potters Bar might be a better location, but their trains don't stop there yet. The closest equivalent is probably Finsbury Park. In terms of distance, that's more like Willesden Junction, but i think it gets more trains stopping there than that. If they, or their successors, ever do start stopping their trains there, it might be worth considering extending the Jubilee Line there. But it's not going to become as important a station as Watford Junction any time in the forseeable future. The Northern or Piccadilly look better placed for that to me. and more passengers would be attracted to the outer ends of lines, where there's plenty of spare capacity. Not sure i get that bit - anyone at Watford is going to catch a fast train to Euston, not sit on a tube train that stops at a dozen places on the way. Wrong! Not everyone at Watford is going to Central London. Millions of people live in North London, and detouring to Euston would be more expensive and in many cases slower and less convenient. By interchanging with the ELL, GN, Victoria and Piccadilly Lines, two branches of the Northern Line, Thameslink and the Jubilee Line, it would serve most of N London. Okay, i think i see what you mean. Does anyone else have any other ideas for it? The trouble with resurrecting the Northern Heights plan is the green belt; the intention was always to drive development of new suburbs in the north, as the Met did for Metroland, but post-WW2 planning policy has put the kybosh on that. If the illustrious Mr Prescott or his successor waves a wand and lets the golf courses and subsidy sinks of Bushey be buried under an avalanche of Barratt boxes, this plan might regain wings. It wouldn't require that. There's enough of Bushey not already served by rail to justify a station. The main destination's Watford. It's not about justifying a station - it's about justifying a new railway, a much more expensive proposition. However, linking it to the ELL would be folly, IMHO; better would be to link it to the GN electrics from Finsbury Park to Moorgate. A graded junction at Moorgate would allow this to be done without conflicting with mainline traffic to KX; the branch to Moorgate itself might need some upgrading to cope, but the frequency would be well within the capability of modern (ie early 20th century signalling systems). Of course, this all comes to pass anyway under my glorious plan to drive the tunnel further south from Moorgate, under the Bank and the Thames, to link up with the lines at London Bridge ... Where would you link them up? Do you mean where would the portal be? Good question. Is there room for a portal around the bulge in the formation where the railway crosses Dockley Road? if not, you'd need to take some land away from buildings beside the line; some grim industrial buildings would be the cheapest option, perhaps those by Tanner Road, Rouel Road, Saint James's Road, etc. Where you put the portal depends to some extent on which lines you want to join up with, and i don't have strong views on that - i don't know enough about the traffic patterns. I also wondered whether that line could be extended. There's nowhere around London Bridge to surface, but some passengers would get a much more direct journey if it ran straight to Denmark Hill and surfaced somewhere around Dulwich or Tulse Hill. That's quite a bit of tunnelling, though. I also wonder whether rather than being extended from Moorgate it could be extended from Old Street to Liverpool Street to give better interchange, then run under Gracechurch Street to London Bridge. Moorgate is a stone's throw from Liverpool Street anyway - it's a shorter walk between them than between some of the more distant platforms at Bank, i'd say. Ideally, there'd be a direct underground passage; Crossrail will join the two stations up, although i would guess that the Crossrail platform won't be usable as an ad hoc foot tunnel. tom -- Who would you help in a fight, Peter van der Linden or Bill Gates? |
#2
![]() |
|||
|
|||
![]()
Tom Anderson wrote:
The closest equivalent is probably Finsbury Park. In terms of distance, that's more like Willesden Junction, but i think it gets more trains stopping there than that. Finsbury Park is closer to Harrow & Wealdstone in terms of service pattern. All FCC local services stop here, most but not all FCC long distance services stop there, and no GNER services stop here (except the weekend after next, when all GNER services will terminate there...). Stevenage is the ECML's closest equivalent to Watford in service terms, but it's much further away from London. -- John Band john at johnband dot org www.johnband.org |
#3
![]() |
|||
|
|||
![]()
Tom Anderson wrote:
On Thu, 6 Apr 2006, Aidan Stanger wrote: Tom Anderson wrote: On Tue, 4 Apr 2006, Aidan Stanger wrote: [Changing Mill Hill East branch to a shuttle service] If they shortened the train length proportionally, it wouldn't even cost any more to run. What's the train length got to do with it? Going from 15 to 8 minutes would be done by cutting down waiting time, not running more trains, AIUI. Shorter trains use less electricity. Aha. Is that a significant cost in running a train, then? I'd never though of that. It can be. Although electricity is quite cheap. It really depends on how you shorten the trains - if splitting them is a labour intensive process then it could eat up the cost savings. After the peak, Thameslink used to split every alternate train into two 4 car trains until passenger numbers grew so much that overcrowding forced them to abandon this policy. But it wasn't entirely due to the cost of electricity. Trains were (and are) maintained on a "per mile" basis, so taking half of them out of service also reduced the maintenance cost. The interesting thing to consider is how the MHE branch can be made more useful in the long term. One idea I put on my website is to have it as a branch of Crossrail Line 2, and extend it to Watford Junction via MHB, Edgware and Stanmore. This would mean that nobody in North London would have to detour to Euston to catch a train to The North, Er, provided they can get to the High Barnet branch of the Northern line, No, it would interchange with the other lines as well. Where would it go south of Finchley? Highgate, Crouch End, Finsbury Park, Dalston Junction. There it would interchange with ELL and Stratford services, and join Crossrail Line 2 which would run underground to Clapham Junction (via Essex Road, Angel, Kings Cross St.Pancras, Tottenham Court Road, Piccadilly Circus, Victoria, Sloane Square, Kings Road and West Battersea). and they don't want the ECML or MML! If they did, they'd be detouring to Kings Cross or St.Pancras, not Euston. However there would be a stop at Mill Hill Broadway to connect with the Thameslink service, so some MML passengers would also benefit albeit not to the same extent as the WCML passengers. I suppose if this function was considered important enough, more trains could be stopped at MHB. Yes, but I doubt it would be - after all, not many stop at W Hampstead. There's no GNER equivalent of Watford Junction. Stevenage is too far out, and they couldn't get planning permission for their Hadley Wood proposals. Potters Bar might be a better location, but their trains don't stop there yet. The closest equivalent is probably Finsbury Park. In terms of distance, that's more like Willesden Junction, but i think it gets more trains stopping there than that. Under my Crossrail plans, Willesden Junction would become more like Finsbury Park. For more details see my website at http://www.bettercrossrail.co.uk If they, or their successors, ever do start stopping their trains there, it might be worth considering extending the Jubilee Line there. But it's not going to become as important a station as Watford Junction any time in the forseeable future. The Northern or Piccadilly look better placed for that to me. They are, but as they're quite near the GN line they wouldn't extend the catchment area so much. [snip] Does anyone else have any other ideas for it? The trouble with resurrecting the Northern Heights plan is the green belt; the intention was always to drive development of new suburbs in the north, as the Met did for Metroland, but post-WW2 planning policy has put the kybosh on that. If the illustrious Mr Prescott or his successor waves a wand and lets the golf courses and subsidy sinks of Bushey be buried under an avalanche of Barratt boxes, this plan might regain wings. It wouldn't require that. There's enough of Bushey not already served by rail to justify a station. The main destination's Watford. It's not about justifying a station - it's about justifying a new railway, a much more expensive proposition. I know. This is a long term plan, mentioned on the "other stages" page of my website. It's not intended to be built until well after the core sections of Crossrail Lines 1, 2 and 3 (the latter being my own plan for a line incorporating the Canary Wharf branch, which would be deleted from the Line 1 scheme). Some freight bypass routes would have a higher priority than this. It would probably also be a lower priority than some new express tunnels (such as from Battersea to Purley, which would greatly increase capacity on the South Coast route and slash journey times on that and the reinstated Gatwick Express!) However, linking it to the ELL would be folly, IMHO; better would be to link it to the GN electrics from Finsbury Park to Moorgate. A graded junction at Moorgate would allow this to be done without conflicting with mainline traffic to KX; the branch to Moorgate itself might need some upgrading to cope, but the frequency would be well within the capability of modern (ie early 20th century signalling systems). Of course, this all comes to pass anyway under my glorious plan to drive the tunnel further south from Moorgate, under the Bank and the Thames, to link up with the lines at London Bridge ... Where would you link them up? Do you mean where would the portal be? Good question. Is there room for a portal around the bulge in the formation where the railway crosses Dockley Road? I don't think so BICBW. if not, you'd need to take some land away from buildings beside the line; some grim industrial buildings would be the cheapest option, perhaps those by Tanner Road, Rouel Road, Saint James's Road, etc. Central London land is expensive whatever it's currently used for! Where you put the portal depends to some extent on which lines you want to join up with, and i don't have strong views on that - i don't know enough about the traffic patterns. There's really two choices: South Eastern and South Central. Both have capacity issues. South Eastern trains are more overcrowded, but that can easily and relatively cheaply be solved with longer trains (IIRC BR lengthened most platforms to take 12 car trains, but the work was stopped by privatization and is yet to resume). All South Central trains detour over 2km East. Constructing a more direct line would slash journey times for the services that use it. It would also boost line capacity, which isn't much of an issue now, but may become one when the ELL Peckhan branch is constructed. It would be possible to discontinue the SouthCentral service from Victoria to London Bridge, and instead divert them onto the South Eastern via the Peckham to Lewisham line. The main disadvantage is that it would leave Denmark Hill without a direct service to London Bridge, hence the suggestion of having the new tunnel serve Denmark Hill. However there are direct buses, and light rail might be a better option than a new tunnel. I also wondered whether that line could be extended. There's nowhere around London Bridge to surface, but some passengers would get a much more direct journey if it ran straight to Denmark Hill and surfaced somewhere around Dulwich or Tulse Hill. That's quite a bit of tunnelling, though. Yes it is. Tunnelling under the City and the Thames is going to be expensive whatever you do, so if you do it, it's best to make the most of it, and deliver the best possible service improvements. However I have now thought of a cheaper option: surface near Elephant and use two of the tracks that currently run to Blackfriars. I also wonder whether rather than being extended from Moorgate it could be extended from Old Street to Liverpool Street to give better interchange, then run under Gracechurch Street to London Bridge. Moorgate is a stone's throw from Liverpool Street anyway - it's a shorter walk between them than between some of the more distant platforms at Bank, i'd say. Ideally, there'd be a direct underground passage; Crossrail will join the two stations up, although i would guess that the Crossrail platform won't be usable as an ad hoc foot tunnel. I don't see why it wouldn't. IIRC Crossrail platforms are planned to be very wide. -- Aidan Stanger http://www.bettercrossrail.co.uk |
#4
![]() |
|||
|
|||
![]()
In article , Tom
Anderson writes Moorgate is a stone's throw from Liverpool Street anyway - it's a shorter walk between them than between some of the more distant platforms at Bank, i'd say. Looking in an atlas, Moorgate to LS is at least twice as far as the furthest walk between platforms at Bank. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
#5
![]() |
|||
|
|||
![]() Clive D. W. Feather wrote: In article , Tom Anderson writes Moorgate is a stone's throw from Liverpool Street anyway - it's a shorter walk between them than between some of the more distant platforms at Bank, i'd say. Looking in an atlas, Moorgate to LS is at least twice as far as the furthest walk between platforms at Bank. Maybe as the crow flies; certainly not on the number of steps needed, I would think. Moorgate to LS is a short straight walk; Monument District to Bank Central is a winding maze of up escalators, round corners, down escalators, then up escalators again, etc. etc. Although maybe being underground the whole way makes it feel longer as well. Patrick |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail Pudding Mill Lane Portal | London Transport | |||
Streatham Hill to Tulse Hill peak hour passenger services | London Transport | |||
Pudding Mill Lane | London Transport | |||
Whatever happened to the Mill Hill East extension? | London Transport | |||
Mill Hill East | London Transport |