Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
In article , Richard J.
writes Eventually there will be an interchange passage between the "tube" and "subsurface" platforms without the need to pass through the ticket gates, one of the last, achievable, recommendations of the Cullen report following the Kings Cross fire. Do you have a date for this "eventual" change? Is it part of the current project or a "nice-to-have" feature for the indefinite future? It's part of the existing project - from memory, the "Khyber Pass", the existing subway under Euston Road, and the existing steps down to the subsurface lines will become the new "train-side" walking route. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
KXSP Northern Ticket Hall diagram | London Transport | |||
Fwd: Planets Gather on May 5 and May 17, 2000 | London Transport | |||
Network Rail now on Northern Ticket Hall / Western Concourse site | London Transport | |||
Kings Cross St Pancras Northern Ticket Hall progress. | London Transport | |||
KXSP Ticket Hall Now Open | London Transport |