Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
|
#12
![]() |
|||
|
|||
![]() Peter Smyth wrote: How feasible would it be to segregate the lines at Edgware Road by having the through trains to/from Hammersmith using the north island and the terminating trains from Bayswater using the south island? This would remove all conflicting moves in this area. Peter Smyth That would not help. The pair of tracks from Paddington Mainline and the pair from Bayswater merge on a flat junction well before Edgware Road, IIRC. In the long term I would like to see CrossRail take over the Hammersmith Branch. Four long TPH should suffice. Some judicious re-organization of the intermediate stations should ensure we have stops at sensible intervals. That would sure beat reversing trains at Paddington. Then, the Wimbleware trains could be extended to Baker Street for reversal. The Met. could run right thru to Barking, or beyond. Edgware Rd would retain its layout. Circle Line trains would be held there so as to maintain a clock face service. In the event that the Circle would ever be out of whack (Can you imagine THAT), Wimbleware trains could be reversed at Edgware Road and Met trains at Baker Street for the duration. Adrian. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Charged more to cross London than Aberystwyth to London UPDATE | London Transport | |||
North London Line update | London Transport | |||
East London Line update | London Transport | |||
End of London's Trams Update | London Transport | |||
East London Line Progress Update | London Transport |