Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]() "R.C. Payne" wrote in message ... wrote: Is it really sensible/cost-effective to have 100mph capability for these, rather than modify (presumably re-gear) for better acceleration - or have a lower-spec traction package? I can't imagine that there's much chance of the units exceeding 50mph, unless they operate on other (non-TfL) routes at some point in the future. Perhaps it's cheaper that way, as they can just supply another off-the-shelf electrostar. What is the top speed of a 376? I'm guessing that is what these trains will end up being. 100 mph isn't mentioned in the TfL press release. It looks as though the Beeb saw the word Electrostar, looked up the details of the Southern and Kent Coast 375/377s. put two and two together and made five. I would expect the ELLX and North London stock to be geared for 60 mph, which is the most they'll do on those routes in service, or perhaps 75 mph like the Kent Link 376 Electrostars. Peter |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Travel costs hitting the low paid in outer London (zones 4 to 6) | London Transport | |||
Heathrow T5 Pods (aka 'ULTra PRT') begin three week "confidence trials". | London Transport | |||
Final design for the "New Bus for London" (aka BorisBus / newRoutemaster) unveiled | London Transport | |||
Central line outer reaches | London Transport | |||
The truth about the LibDems aka FibDems | London Transport |