Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]() Peter Masson wrote: TfL also hope to extend the Barking - Gospel Oak service to Clapham Junction, taking over the WLL, and this implies acquiring a fleet of diesel units (as well as alterations at Gospel Oak), unless TfL can get someone to pay for wiring Barking to Gospel Oak. Electrification of the GOBLIN route is envisaged as part of the opening of the new Thames Gateway Container Port on the former Shell site in Thurrock. The governmet approved the port last month. TfL will not however get a totally free ride on this IIAIC This could release two emu diagrams from the WLL. But the real need on the NLL is for longer trains, and this requires platform lengthening, notably at Willesden Junction HL. Options in the procurement from Bombardier presumably allow for the NLL units to be extended to 4 car. Options in the press release speak of further trains and additional coaches |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Travel costs hitting the low paid in outer London (zones 4 to 6) | London Transport | |||
Heathrow T5 Pods (aka 'ULTra PRT') begin three week "confidence trials". | London Transport | |||
Final design for the "New Bus for London" (aka BorisBus / newRoutemaster) unveiled | London Transport | |||
Central line outer reaches | London Transport | |||
The truth about the LibDems aka FibDems | London Transport |