Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I see the drain is closed again this Saturday - what's going on? I
remember trying to go on it a few weekends after it was reOpened, and found it closed? What's going on - couldn't they have done this whilst it was closed? -- The presence of this signature shows that this message has been scanned for misplaced apostrophes by the common sense scanner. However, some apostrophes may not be included where required due to boredom, gross negligence, budget cuts, incompetence, stupidity or just plain laziness. http://www.railwaysonline.co.uk |
#2
![]() |
|||
|
|||
![]() I see the drain is closed again this Saturday - what's going on? I remember trying to go on it a few weekends after it was reOpened, and found it closed? What's going on - couldn't they have done this whilst it was closed? Apparently from the very beginning they knew that they won't have enough time to do it, and Saturday closures (until the end of the year) were planned before the closure. |
#3
![]() |
|||
|
|||
![]()
All non-emergency Tube works are carried out at the weekends to
minimise inconvenience. I would imagine with the W&C Line that they wanted to get the line open ASAP, and so some less essential work was left over to be completed later. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Wimbledon - East Putney engineering works | London Transport | |||
London Overground - lack of engineering works information | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |