Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
In article . com,
TheOneKEA writes All Central Line trains are driven automatically by a central control computer (in simple terms). Not quite. I used to think this too but an AET who works on the Central informed me that the ATO function is locally controlled from the trackside SERs, which implies that the central computers are merely a regulatory and supervisory system (i.e. a souped-up programme machine); Neither is quite correct. The ATO/ATP function is on the train and controlled by the driver: - in ATO mode the driver presses "start" and ATO drives the train under the restrictions set by ATP; - in Coded Manual the driver drives the train himself under the restrictions set by ATP. In both cases the train is informed of the permitted speed limit in the current and next blocks by codes in the rails. These are sent by the trackside units. At stations, a docking beacon sends the train details of the line ahead and, in ATO mode, whether or not to stop at the next station and whether to go "full welly" or coast at various places to increase the running time (and so space out trains). The central computer: - sets routes for the trains at junctions (like a programme machine); - instructs the beacons to issue "don't stop" and "coast" instructions. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Does anyone know where Ranelagh Bridge is? | London Transport | |||
Does Anyone Know When The New Ubdersea Tunnel Will Be Completed? | London Transport | |||
Never a dull moment on the Tube | London Transport | |||
Anyone know about Sat Nav - Tom Tom, etc ? | London Transport | |||
Anyone know about East London Line Project progress? | London Transport |