![]() Dave Arquati wrote: I doubt it. The £5.7m may well include a large contingency figure (+40% is common). Contingency for what exactly and why 40%. Notice how estimates for anything these days are bumped up out of all proportion by addding all kinds of non essential guff into it. So now we have "regeneration costs" escalating the Olympics. What are regeneration costs and I strongly suspect that the lottery fund will pay for what should probably be Government expenditure. If I submitted an estimate for anything and it contained contingency my arse would be kicked out of the door. Kevin |
#2
![]() |
|||
|
|||
![]() "Kev" wrote in message ups.com... I doubt it. The £5.7m may well include a large contingency figure (+40% is common). Contingency for what exactly and why 40%. Is it just possible that the treasury keep a running total of previous project overruns? I think they call it 'optimism bias' or some such. Paul |
#3
![]() |
|||
|
|||
![]()
Paul Scott wrote:
"Kev" wrote in message ups.com... I doubt it. The £5.7m may well include a large contingency figure (+40% is common). Contingency for what exactly and why 40%. Is it just possible that the treasury keep a running total of previous project overruns? I think they call it 'optimism bias' or some such. Basically, yes. The Treasury has evidence that estimates are routinely biased (optimistically) by people appraising projects, so they have a set of optimism bias figures that they require to be built into projects that they fund. The figure varies depending upon the type of project. http://www.hm-treasury.gov.uk./media...imism_bias.pdf For public works not directly funded by the Treasury, various standards exist, and can vary from small figures like 5% for small, fairly predictable works like road resurfacing, to larger figures like 40% for big construction projects. -- Dave Arquati www.alwaystouchout.com - Transport projects in London |
#4
![]() |
|||
|
|||
![]()
Kev wrote:
Dave Arquati wrote: I doubt it. The £5.7m may well include a large contingency figure (+40% is common). Contingency for what exactly and why 40%. Notice how estimates for anything these days are bumped up out of all proportion by addding all kinds of non essential guff into it. So now we have "regeneration costs" escalating the Olympics. What are regeneration costs and I strongly suspect that the lottery fund will pay for what should probably be Government expenditure. If I submitted an estimate for anything and it contained contingency my arse would be kicked out of the door. If they knew what they were making contingencies for, they wouldn't have to make contingencies... Estimates for public works are rarely accurate - there are so many risks involved. 40% is considered an appropriate amount to mitigate against these risks. It would be more irresponsible *not* to budget for risks in these works - if something unforeseen then came up, everyone would complain that the public body should have considered such difficulties before budgeting! I'm not sure what you submit estimates for, but I suspect the risks are largely in your control. That cannot be said for public works. Besides, if you ever use insurance, that's a contingency fund. -- Dave Arquati www.alwaystouchout.com - Transport projects in London |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris approves third Blackwall tunnel and new ferry in Thamesmead | London Transport | |||
Advice for Thames Tunnel and/or Fancy Fair visitors | London Transport | |||
Thames tunnel walkthrough - spare ticket Friday pm | London Transport | |||
A Moorgate to London Bridge Tunnel (Old chestnut) | London Transport |