Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
A few months ago there was a series of posts here about the bus
station at Hammersmith and proposals from years ago to extend it. Going past there the other day work has very much re-started (at last), and there are signs up describing it as the "Hammersmith Lower Level Bus Station" or something like that. I'll try to get some photos perhaps next weekend. I say "re-started" because the site including the Emerald Centre was levelled, graded, and some basic layout completed well over a year ago, but then it was allowed to become completely overgrown. There's nothing new on the LB Hammersmith & Fulham planning site, so they must be using the planning permission granted in December 2004, which only gave permission for five year's usage as a bus station. I'm not sure if the five years started in December 2004, or when the thing gets finished, hope it's the latter for sense' sake! As part of the works, the pedestrian subway in the vicinity was closed 3-4 months ago, and a load of telecoms ducts run through it, strapped to the ceiling of the subway. I see they have now started to brick up the subway entrances and back fill it around these telecoms ducts - looks like the part under the actual road will be left as an empty void, but with no access into it. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
The Jubilee Line Night Tube started last night, with Northern onNovember 18 | London Transport | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Kings Cross or St Pancras? Eurostar started already? | London Transport | |||
Camden Town station rebuiliding public inquiry has started | London Transport |