Home |
Search |
Today's Posts |
#71
![]() |
|||
|
|||
![]()
Matt Wheeler wrote:
"Dave A" wrote in message ... Tom Anderson wrote: On Tue, 9 Jan 2007, asdf wrote: No, because the Mets replace H&Cs. asdf has a point - the current H&C service is only 8tph. If all 15tph Met go to Barking, then 7tph will have to be removed from the District service - I imagine that demand for services along the southern Circle is higher than for the northern Circle. Surely, though, the situation with the Met will be much as now (unless i've missed something).... the off-peak timetable only has the Uxbridge services running through to Aldgate, so presumably those (every 10 mins ?) would be the ones going to the H&C route to Barking, whilst the Watford & Amersham services will continue to run only as far as Baker Street. That may be so, but the off-peak service pattern isn't the problem, it's the peak one (although H&C and Circle services are pretty invariable throughout the day). -- Dave Arquati www.alwaystouchout.com - Transport projects in London |
#72
![]() |
|||
|
|||
![]()
Tom Anderson wrote:
On Wed, 10 Jan 2007, Dave A wrote: Tom Anderson wrote: On Tue, 9 Jan 2007, asdf wrote: On Tue, 9 Jan 2007 13:07:54 -0000, John Rowland wrote: Personally I dont see why the Met line has to run to Barking? Because at the moment, the Met trains empty out in one direction and fill up in the other. It's better to have them filling up with new people as the old ones get out. And by swapping the eastern destinations of the Met and H&C, exactly the same thing happens with the H&C... But the Met east of Baker Street has 120 carriages per peak hour, whereas the H&C has something like 48 carriages per peak hour. But if 15 Met tph are to head through Aldgate East, some Districts will have to be cut back to Tower Hill (and/or Mansion House) to make room, which just shifts the same situation onto those Districts. No, because the Mets replace H&Cs. asdf has a point - the current H&C service is only 8tph. If all 15tph Met go to Barking, then 7tph will have to be removed from the District service Allowing another 7tph of Hammersmith trains to be Teacups rather than Aldgates - by jove, Holmes, we've cracked it! Assuming they reverse somewhere like HSK or Edgware Road, rather than Tower Hill, of course. - I imagine that demand for services along the southern Circle is higher than for the northern Circle. Ah, but between where? If the demand is along the actual circle bit (Charing Cross to the City, say), then heavily pruning some Districts back to a western point and replacing them with Teacups would be fine; if the demand is actually from the western District suburbs to the south side of the circle, it wouldn't, and the admittedly far more sensible idea of reversing some Districts at Tower Hill would come into play. The only case where you need to preserve the full District service beyond Tower Hill is if there's much more demand for trips from the eastern end of the District/H&C to the south circle than the north. Hmm. I think i'm in knip there. Anyway, yes, there you, all fun and games until someone loses a peak-time through train. OK, here's some data to chew on - Figure 4C.2 of the Mayor's Transport Strategy is a particularly useful diagram showing Underground crowding levels for 2001, with the following figure showing predictions for 2011 - so imagine something between the two. The width of the lines is the magnitude of demand, and the colour is the crowding level. (You need good zoom or good eyesight to check that you're looking at the correct direction of travel.) 2001 shows a higher and crowded passenger flow from Aldgate East to Tower Hill, and a much lower (but still crowded) flow from Aldgate East to Liverpool Street. 2011 prediction (albeit this is meant to be without the Transport Strategy) shows crowding again to Tower Hill and a still low but "very crowded" service (i.e. crammed) from Aldgate East to Liverpool Street. Demand from the western branches into Victoria and the City is very high and very overcrowded, compared to that from the east. The difference in the magnitude of demand in the east suggests that the Tower Hill service should be much more frequent than the Liverpool Street service (perhaps doubly so), which I think is about the shape of things at the moment. It's also worth bearing in mind that a reduced-frequency east-District/southern-Circle service may push people onto the very-high-frequency Central line at Mile End to get to Bank or St Paul's (whereas they would have stayed on to Monument, Cannon St or Mansion House), and the Central line already suffers worse overcrowding than either the District or the H&C in this area. To me this suggests that the District frequency to/from the east should be maintained, as the balance is quite delicate. Perhaps 7tph from the Met will terminate at Aldgate alongside 8tph from the new H&Circle service. Well, or that. So now we have both the Met and the H&C having half Aldgate and half through trains. What fraction of District trains reverse at Tower Hill rather than running through? ISTR it's actually quite a lot. As Clive mentions, it's about a third of the District service (Ealing Broadways). Trying to get my head around this service pattern is as difficult as the multitude of proposals for the North London Railway. I had a look at the service patterns on the railway south of the river the other day. *shudders* Indeed. However, whilst the downside is that they're complicated, the upside is that they end up matching demand more closely than simpler Underground all-or-nothing service patterns. They do also relieve some stress from the Underground by offering a choice of termini... -- Dave Arquati www.alwaystouchout.com - Transport projects in London |
#73
![]() |
|||
|
|||
![]()
An improved service from the north side of the circle down to Barking
would have a great effect on the central, plenty of people (myself included) could take either into the city, but opt for the central (which involves changing) on the basis of reliability, frequency and speed. With a decent frequency and spanking new ACed up S Stock I know I'd prefer that to standing with my head at a 45 degree angle squashed up against the doors in 40 degrees on the central. T-cup seems to make a lot of sence, the paddington stations improvements would also be well recieved, I do Paddington - Bow Road a fair bit, and will normally take bakerloo, central and district rather than gamble on the cooperation of the H&C. Thought the unified aldgate interchange is interesting (I do this on foot a fair bit, one of the great irritations of oyster is that it would not let me do this without paying for the privalage of walking), If that could be done it would be a very usefull addition for people living/working on the district. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Is Finchley Road On The Circle and H&C Line | London Transport | |||
circle line service | London Transport | |||
Lengthening trains on the circle and Edgeware road branch of theDistrict lines | London Transport | |||
District line service pattern | London Transport | |||
district, circle and hammersmith and city lines - reorganisation idea | London Transport |