Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#21
![]() |
|||
|
|||
![]()
David Cantrell wrote:
On Sat, Jan 27, 2007 at 01:11:11PM +0000, Sky Rider wrote: 2 - have they installed enough gates at both ends of the station (available space permitting) to avoid a repeat of the peak-hour crush at Farringdon? At least when I've used City Thameslink it's not been particularly busy. This is normally at the end of the morning peak, at a time when London Bridge (for example) is heaving. Maybe it's something to do with Blackfriars and Farringdon both having more trains to more places, but only being a short walk away (which is particularly relevant given the sluggish journey on trains between these stations!). -- Dave Arquati www.alwaystouchout.com - Transport projects in London |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Oyster PAYG gateline experiment | London Transport | |||
UTS Gateline codes | London Transport | |||
Stratford Jubilee gateline defunct | London Transport | |||
Wandsworth Town station gateline | London Transport | |||
Waterloo gateline | London Transport |