London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #28   Report Post  
Old February 22nd 07, 06:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 46
Default Passenger door buttons gone on refurb D Stock

Boltar wrote:

Odd , last time I viewed this post it was corrupted, now I can
actually see what you wrote. Anyway , it may be a useful amount if
only need those stations of routes via , but thats hardly a huge
proportion of the possible total.

Eight stations is four times the proportion that two is.

And if you are a regular user of the Piccadilly Line, you'll use on
average two stations a day.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Door to door transport JNugent[_5_] London Transport 1 April 30th 13 08:02 AM
First passenger service journey for LUL 09 stock Paul Corfield London Transport 81 July 29th 09 05:14 PM
Door open buttons on London Underground Tristan Miller London Transport 25 April 8th 08 06:06 PM
The first D78 Production Refurb Bradley Chapman London Transport 0 October 7th 04 11:15 AM
Liverpool St Bus station refurb dan London Transport 1 October 25th 03 08:03 AM


All times are GMT. The time now is 01:41 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017