Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]() "chunky munky" wrote in message ps.com... The New (Southern) Watford South Junction, was started during the Easter Shutdown. It is scheduled to be commissioned during the Summer. Also I believe (but dont have the dates to hand but they should be on the TfL website) that there will be a number of weekday shutdowns Harrow/ Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden. Interesting... the current PDF on the TFL site for the next 6 months track closures makes no mention of any weekday closures on the met. see http://www.tfl.gov.uk/tfl/livetravel...k-closures.pdf |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Metropolitan line Watford | London Transport | |||
London Metropolitan line Watford | London Transport | |||
M11 or A1 easiest tube connection for Heathrow | London Transport | |||
Cirlce Line Reverts to Circle / New Metropolitan Stock | London Transport | |||
The London Underground and its South African connection | London Transport |