Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
H&H 16.45:
Turned up at 16.45 Hayes & Harlington for 16.59 train to Oxford. VDU in foyer said train was on time. Then at 16.55 an announcement stated that it was cancelled. VDU now saidf it was cancelled - no reason given. Question: why did they wait until it was almost due to announce that it was cancelled since all Oxford trains had been cancelled all afternoon (and still are at 02.00 am next day). Then at 17.05 a 'special' arrived for Slough - but no announcements were made. The ticket office at H&H wasd closed. There were no station staff on duty. No announcements were being made. destinations screens remained uninformative. Paddington 23.15: All trains into/out of cancelled or 'delayed.' Last Connect left at about 23.00. Only ONE local service to Reading 00.35. Question: why couldn't Connect have laid on an extra service for local stations to H&H at say 23.45? No NR / FGW customer service staff visible on concourse. No info. on display screens. NO BUS SUBSTITUTIONS for local stations - zero, zilch, sfa. No audible announcements (a few inaudible announcements drowned out by echos as usual). Typical lack of customer service for a trainco that really does want to lose its franchise - and the sooner the better. CJB. On Jul 15, 11:56 pm, Dave A wrote: Roland Perry wrote: In message . com, at 11:38:07 on Sun, 15 Jul 2007, CJB remarked: Most trains delayed by hours or cancelled to/from Paddington and points west of Slough. FGW services in complete disarray. Been going on on most of Sunday afternoon, evening. Must have missed that: I departed Reading at 14.33 - the train was nearly 10 minutes early arriving from Paddington. I finally got back to London well over two hours late. Train from Ledbury at 1646 was running fine as far as Oxford, where the train manager sounded very surprised to announce that the service was cancelled (after loads of people had gotten on and it was full and standing). Then, after about ten minutes of general confusion, the service was announced as continuing to Didcot so everyone piled back on again to get to Didcot (in retrospect, a bad idea... I should've followed my instinct and gotten straight on the coach from Oxford). More hanging around at Didcot with hundreds of passengers being advised to wait for the next London train, a 35-minute-late service which was being reported on the displays as "full and standing from Bath". A London stopping service from Oxford turned up after about 15 mins, which about half the passengers decided to gamble on since it was actually there; it travelled along without incident as far as Reading when it was announced as terminating there just before arriving. Mayhem at Reading with various London services standing in the platforms, a queueing system in operation for Waterloo trains, but little in the way of announcements other than a scrawled noticeboard next to the (empty) information desk. I tried to get on a Railair coach to Heathrow which was about to depart but my ticket (London Terminals) was rejected ("we don't get any revenue from that") so I went off and bought another ticket and then waited for the next coach 30 mins later, boarded with about two other passengers, and then trundled into London by Tube from Heathrow. I was not impressed by the poor level of information (except from the train manager of the original service who cheerfully gave out all the information he had), and I'll wait with baited breath to see if First will refund my Railair ticket as well as my original ticket... Ironically I was almost due a refund for the outward journey on Friday evening thanks to a racially abusive (and slightly violent) passenger in my carriage who had to be carted off the train at Slough and delayed it by about 55 minutes. -- Dave Awww.alwaystouchout.com- Transport projects in London |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ECML - Major disruption this evening | London Transport | |||
Broken Down Train - Major Rail Disruption on Brighton Line | London Transport | |||
Oyster PAYG to Slough? | London Transport | |||
Slough interactive map | London Transport | |||
FGW Link excels even Thames Strains at public safety (lack of ...) | London Transport |