Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On Wed, 22 Aug 2007 13:17:07 -0700, Mr Thant
wrote: On Aug 22, 8:05 pm, Boltar wrote: The train is control by the ATO cable signals , not a cluster of coloured lights in the tunnel. Or is "signal failure" just an LU catch all phrase for a computer failure? Yes. For reasons I can't remember, there are only something like 5 or 6 possible phrases they'll use to explain delays to the public. "Signal failure" is very broad and could mean any kind of signalling/ ATO/points/etc problem. "Passenger action" is another one. "Signal failure" is at least meaningful (though posibly slightly misleading). The phrase "passenger action" deserves to be sent to the same hell to which I would banish all management speak. ("There's no I in team" -- "Unless you're French", I always reply.) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Signal Failure | London Transport | |||
Piccadilly line signal failure | London Transport | |||
Signal failure on the central line? | London Transport | |||
Jewellery can be purchased that will have holiday themes, likeChristmas that depict images of snowmen and snowflakes, and this type offashion jewellery can also be purchased with Valentine's Day themes, as wellas themes and gems that will go with you | London Transport | |||
Why can't LU cope with a signal failure? | London Transport |