Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Aug 31, 7:34 am, chunky munky
wrote: To get the line open ASAP, they didnt bother with moving block sections or ATO, instead just having the same signalling system, but as a fixed block with Train Stops. And the system is so sparse that train capacity is restricted to far below what the stations can easily handle - each station has basically one home signal (with a VERY high speed overlap) and one starter signal (with a low/medium speed overlap). As a result, run-in/run-out capacity on the JLE is severely restricted, as the distance between block sections is so much higher than one of the older, more thoroughly signalled lines. Once the new moving block system comes into its own, the absolute capacity of the line will increase significantly, as long as dwell times are kept as low as possible. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Replacement boat service on the Jubilee Line this weekend | London Transport | |||
Canning Town DLR junctions | London Transport | |||
A13 Canning Town and East India Dock Link Tunnel | London Transport | |||
Canning Town footpaths | London Transport | |||
A13 - Canning Town (new) Flyover virtually complete! | London Transport |