Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() "Peter Heather" wrote in message ups.com... From experience that isn't a problem and takes a matter of seconds. The biggest problem at Farringdon is the extremely cramped facilities for passengers. The exit stair from the northbound platform is extraordinarily narrow and it takes ages to get off the platform in the morning peak. Almost as bad is the access along the narrow southbound platform when it is crowded in the evening. I hope the station gets completely rebuilt in the TL plan otherwise it will never cope with the proposed 12 car trains. You've missed all the discussions over the last few years about the Moorgate Branch being closed so that the Farringdon platforms can be lengthened to 12 cars, and the entire station rebuilt for Thameslink then? Paul |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport | |||
Thameslink 2000 and other animals | London Transport | |||
Thameslink 2000 | London Transport | |||
THAMESLINK 2000 | London Transport | |||
New Thameslink 2000 proposals? | London Transport |