Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() "kytelly" wrote in message oups.com... On 8 Nov, 10:21, "Alan Osborn" wrote: A far better solution for the International Platforms would be for South Eastern main line trains which at present have to negotiate the congested Borough Market tracks to reach Charing Cross. The Infrastructure to divert these is all in place curtesy of Eurostar, and use paths vacated by the Eurostar trains Charing Cross route would be downgraded and less congested as only used by suburban trains. For the die-hards who want to go to London Bridge or Charing Cross then they could transfer to Waterloo East. This sounds a good idea imho, at least while London Bridge/TLK is being rebuilt There are 5 main line trains into Charing Cross in the peak hour, or 8 if you include trains starting from Tunbridge Wells, and nowhere near enough paths for them between Bickley Junction and Linford Street Junction, especially as, after pressure from TfL, the E paths have been allocated to increasing frequencies of Victoria - Beckenham Junction - Orpington stoppers. Even if trains have to be diverted away from Charing Cross during Thameslink works, and paths can be found for them on the Chatham line, Victoria (Chatham side) has spare capacity since the Boat Trains left. Peter |
#2
![]() |
|||
|
|||
![]()
On Nov 8, 11:05 am, "Peter Masson" wrote:
"kytelly" wrote in message oups.com... On 8 Nov, 10:21, "Alan Osborn" wrote: A far better solution for the International Platforms would be for South Eastern main line trains which at present have to negotiate the congested Borough Market tracks to reach Charing Cross. The Infrastructure to divert these is all in place curtesy of Eurostar, and use paths vacated by the Eurostar trains Charing Cross route would be downgraded and less congested as only used by suburban trains. For the die-hards who want to go to London Bridge or Charing Cross then they could transfer to Waterloo East. This sounds a good idea imho, at least while London Bridge/TLK is being rebuilt There are 5 main line trains into Charing Cross in the peak hour, or 8 if you include trains starting from Tunbridge Wells, and nowhere near enough paths for them between Bickley Junction and Linford Street Junction, especially as, after pressure from TfL, the E paths have been allocated to increasing frequencies of Victoria - Beckenham Junction - Orpington stoppers. Even if trains have to be diverted away from Charing Cross during Thameslink works, and paths can be found for them on the Chatham line, Victoria (Chatham side) has spare capacity since the Boat Trains left. Peter Can Waterloo International now be regarded as a closed station? Neill |
#3
![]() |
|||
|
|||
![]()
On Nov 8, 11:17 am, Neillw001 wrote:
Can Waterloo International now be regarded as a closed station? It was never really a station. Just a few platforms walled off from the rest of the station. B2003 |
#4
![]() |
|||
|
|||
![]()
On 8 Nov, 11:05, "Peter Masson" wrote:
"kytelly" wrote in message oups.com... On 8 Nov, 10:21, "Alan Osborn" wrote: A far better solution for the International Platforms would be for South Eastern main line trains which at present have to negotiate the congested Borough Market tracks to reach Charing Cross. The Infrastructure to divert these is all in place curtesy of Eurostar, and use paths vacated by the Eurostar trains Charing Cross route would be downgraded and less congested as only used by suburban trains. For the die-hards who want to go to London Bridge or Charing Cross then they could transfer to Waterloo East. This sounds a good idea imho, at least while London Bridge/TLK is being rebuilt There are 5 main line trains into Charing Cross in the peak hour, or 8 if you include trains starting from Tunbridge Wells, and nowhere near enough paths for them between Bickley Junction and Linford Street Junction, especially as, after pressure from TfL, the E paths have been allocated to increasing frequencies of Victoria - Beckenham Junction - Orpington stoppers. Even if trains have to be diverted away from Charing Cross during Thameslink works, and paths can be found for them on the Chatham line, Victoria (Chatham side) has spare capacity since the Boat Trains left. Peter- Yes; whenever this topic comes up, I comment that the problems are with the approaches and not the capacity at termini, therefore not addressed by freeing up more platforms at Waterloo. The South Eastern side of Victoria is very underused, and Waterloo, with its long turnaround times compared with somewhere like Charing Cross, isn't exactly stretched. The problems are Borough Market, the two two-track routes between Bromley and Victoria and the two-track route through Queenstown Road on the "Windsor" side. It is true that there are capacity problems at Waterloo due to platform lengths, but the Eurostar platforms are on the wrong side to help much. Incidentally, I note an interim stage in plans for Waterloo to be increasing platform lengths to 10. With most trains in units of 4, this isn't going to make much difference. |
#5
![]() |
|||
|
|||
![]()
On 8 Nov, 11:50, MIG wrote:
Yes; whenever this topic comes up, I comment that the problems are with the approaches and not the capacity at termini, therefore not addressed by freeing up more platforms at Waterloo. The South Eastern side of Victoria is very underused, and Waterloo, with its long turnaround times compared with somewhere like Charing Cross, isn't exactly stretched. The problems are Borough Market, the two two-track routes between Bromley and Victoria and the two-track route through Queenstown Road on the "Windsor" side. But that doesn't explain why they're not planning to send some suburban Charing Cross trains to Waterloo via Lewisham and Peckham Rye. That would help to free up the Borough Market tracks without adding to congestion between Bromley and Victoria. |
#6
![]() |
|||
|
|||
![]() wrote in message oups.com... On 8 Nov, 11:50, MIG wrote: Yes; whenever this topic comes up, I comment that the problems are with the approaches and not the capacity at termini, therefore not addressed by freeing up more platforms at Waterloo. The South Eastern side of Victoria is very underused, and Waterloo, with its long turnaround times compared with somewhere like Charing Cross, isn't exactly stretched. The problems are Borough Market, the two two-track routes between Bromley and Victoria and the two-track route through Queenstown Road on the "Windsor" side. But that doesn't explain why they're not planning to send some suburban Charing Cross trains to Waterloo via Lewisham and Peckham Rye. That would help to free up the Borough Market tracks without adding to congestion between Bromley and Victoria. They probably see no point in doing something temporarily, which can't continue once the Nine Elms flyover is demolished to rework the station approaches properly. From the NR documents it has basically already been decided that the platforms will be used by SWT during the coming Waterloo rebuild. The WIT report on the DfT site suggests that there is only capacity for 6-8 trains per hour from the Nine Elms flyover, as it is only single track. Paul |
#7
![]() |
|||
|
|||
![]() |
#8
![]() |
|||
|
|||
![]()
wrote
But that doesn't explain why they're not planning to send some suburban Charing Cross trains to Waterloo via Lewisham and Peckham Rye. That would help to free up the Borough Market tracks without adding to congestion between Bromley and Victoria. It would be so slow that passengers wouldn't use them. The Dartford - Blackfriars/Holborn trains never loaded well, and were eventually withdrawn, while the Dartfod - Bexleyheath - Victoria service, a comparatively recent innovation, are also lightly loaded. Peter |
#9
![]() |
|||
|
|||
![]()
On 8 Nov, 15:30, "Peter Masson" wrote:
wrote But that doesn't explain why they're not planning to send some suburban Charing Cross trains to Waterloo via Lewisham and Peckham Rye. That would help to free up the Borough Market tracks without adding to congestion between Bromley and Victoria. It would be so slow that passengers wouldn't use them. The Dartford - Blackfriars/Holborn trains never loaded well, and were eventually withdrawn, while the Dartford - Bexleyheath - Victoria service, a comparatively recent innovation, are also lightly loaded. Peter I would contest that at peak times the Dartford to Victoria service is loaded pretty heavily, at least it is on leaving Victoria. It also seems to have a reasonable patronage by day, but then again perhaps my subjective judgement is a bit out on that one. |
#10
![]() |
|||
|
|||
![]()
On 8 Nov, 15:30, "Peter Masson" wrote:
wrote But that doesn't explain why they're not planning to send some suburban Charing Cross trains to Waterloo via Lewisham and Peckham Rye. That would help to free up the Borough Market tracks without adding to congestion between Bromley and Victoria. It would be so slow that passengers wouldn't use them. The Dartford - Blackfriars/Holborn trains never loaded well, and were eventually withdrawn, while the Dartford - Bexleyheath - Victoria service, a comparatively recent innovation, are also lightly loaded. Peter I would contest that at peak times the Dartford to Victoria service is loaded pretty heavily, at least it is on leaving Victoria. It also seems to have a reasonable patronage by day, but then again perhaps my subjective judgement is a bit wonky. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Travelcard from Bat & Ball | London Transport | |||
Travelcard from Bat & Ball | London Transport | |||
Stacie and Brian Ball, perverts! | London Transport | |||
Waterloo International to close | London Transport | |||
Waterloo International to close when St Pancras International opens | London Transport |