Its December 2007; does anyone know why the Arcade at St Pancras isn't
finished yet? |
#2
![]() |
|||
|
|||
![]() "lonelytraveller" wrote in message ... Its December 2007; does anyone know why the Arcade at St Pancras isn't finished yet? Most likely the shopfitters couldn't start until the building work is complete, and the builders were concentrating on the 'station' opening. I'm sure there was a sign on the hoardings saying spring 2008 for opening when I was there a couple of weeks ago... Paul S |
#3
![]() |
|||
|
|||
![]()
On Wed, 5 Dec 2007 10:53:50 -0800 (PST), lonelytraveller
wrote: Its December 2007; does anyone know why the Arcade at St Pancras isn't finished yet? The BBC mini series on St Pancras International showed that the station was handed over on time for fitting out. However the fitting out contractors were running many weeks behind schedule and only just got the Eurostar part of the terminal ready for 14 November. As the station is now operational there is much less flexibility and working time available. While some units can be fitted out behind hoardings there may be elements of the work that are now only possible during night engineering hours. The boss man in charge of getting the fit out complete and getting retailers in to their outlets looked markedly ****ed off in all of the screen shots where he featured. I imagine there will be threats of claims for lost revenue whizzing back and forth. -- Paul C Admits to working for London Underground! |
#4
![]() |
|||
|
|||
![]()
Paul Scott wrote:
I'm sure there was a sign on the hoardings saying spring 2008 for opening when I was there a couple of weeks ago... Paul S They're opening the Arcade units on a progressive basis (therefore many units should be fitted out before Spring 2008) - that way they'll minimise visitor dissatisfaction and any compensation payments that the retailers may be seeking. The Market may well be fitted out before the Arcade (they're aiming towards a New Year opening for the Market according to the official StP website), but IMO the Circle and Rendevouz areas are even further behind - the brasserie won't open until Spring 2008, and they haven't even decided on a season for the completion of the Circle (2008 is as much as they'll say for now). On the plus side, the *second* M&S unit (i.e. the one in the Circle area) has its own bakery! For anyone who happens to be rueing the absence of a First Class lounge at StP (not many on this newsgroup I presume), that facility will be made available in Spring 2008. |
#5
![]() |
|||
|
|||
![]()
"Paul Corfield" wrote in message
... On Wed, 5 Dec 2007 10:53:50 -0800 (PST), lonelytraveller wrote: Its December 2007; does anyone know why the Arcade at St Pancras isn't finished yet? The BBC mini series on St Pancras International showed that the station was handed over on time for fitting out. However the fitting out contractors were running many weeks behind schedule and only just got the Eurostar part of the terminal ready for 14 November. As the station is now operational there is much less flexibility and working time available. While some units can be fitted out behind hoardings there may be elements of the work that are now only possible during night engineering hours. That, plus the main cash is paid over. No need for the fitters to get their arse into gear. Expect the final 'tweaks' to last months. |
#6
![]() |
|||
|
|||
![]()
On Dec 5, 9:12 pm, Sky Rider wrote:
Paul Scott wrote: I'm sure there was a sign on the hoardings saying spring 2008 for opening when I was there a couple of weeks ago... Paul S They're opening the Arcade units on a progressive basis (therefore many units should be fitted out before Spring 2008) - that way they'll minimise visitor dissatisfaction and any compensation payments that the retailers may be seeking. The Market may well be fitted out before the Arcade (they're aiming towards a New Year opening for the Market according to the official StP website), Where is the Market? I've been through there a couple of times and can't work it out. Jonn |
#7
![]() |
|||
|
|||
![]() wrote in message ... On Dec 5, 9:12 pm, Sky Rider wrote: Paul Scott wrote: I'm sure there was a sign on the hoardings saying spring 2008 for opening when I was there a couple of weeks ago... Paul S They're opening the Arcade units on a progressive basis (therefore many units should be fitted out before Spring 2008) - that way they'll minimise visitor dissatisfaction and any compensation payments that the retailers may be seeking. The Market may well be fitted out before the Arcade (they're aiming towards a New Year opening for the Market according to the official StP website), Where is the Market? I've been through there a couple of times and can't work it out. Under the PIS displays, on the south side of the domestic concourse/cross passage, basically the entire wall opposite the domestic ticket office and 'The Circle' shopping area. Paul |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
St Pancras International opening day | London Transport | |||
victoria line shutting at 10 every school night til november | London Transport | |||
Irish Railway Record Society talk 16th November 2006 | London Transport | |||
Oyster Unresolved Journey as of November 2006 | London Transport | |||
Hammersmith & City strike on 13 November | London Transport |