Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Mon, 10 Dec 2007 20:21:49 +0000, Tom Anderson
mangled uncounted electrons thus: On Mon, 10 Dec 2007, Mizter T wrote: On 10 Dec, 19:11, Tom Anderson wrote: Someone remind me - why is the ELL closing for three years? Tis two years - the plan is to have the ELLX open in December 2009 (i.e. when the railway timetables change). Aha. This leaflet, in which, allegedly, "information is correct at time of going to print - November 2007": http://www.tfl.gov.uk/assets/downloa...re-leaflet.pdf says "The East London line will close on 22 December 2007 for major extension work and will reopen by summer 2010 as part of the London Overground network.". Summer 2010 is public works code for winter 2010, from which i calculated three years. But if it only takes two, that's much better. I have thought this too - sure, there are big works to be done (flyover at New Cross Gate, station and bridge at Shoreditch High St, ramp - already half-built - up from Whitechapel, etc etc), but on the face of it they don't need the existing ELL to close... Right. The work connected with the ramp from Whitechapel, perhaps, but Shoreditch High Street is nowhere near the current line, and the NXG flyover surely just involves closing the NXG branch! However I think the plan might involves materials being transported by rail from the Silwood Triangle works site, and perhaps from restored link(s) with the main lines at either New Cross or New Cross Gate or both - of course the latter will have a permanent connection when through ELLX services start running, though perhaps the former is an easier place for works trains to access from the rest of the network. This sounds plausible, but an appallingly bad excuse. I've also heard that there's to be large-scale changes to power and signals to change them to NR standards. Still hard to see how this'll take 2-3 years. On a related note, Liverpool Street is closed for a week over christmas "as a result of major engineering work on the approach lines to the station, in connection with the extension of TfLs East London line". I don't know if that's the ramp or a new track connection or preparatory works or what. grin As LST will be closed for the bridge removal, NR are taking the opportunity of doing a lot of work on the overhead lines in the station and on the immediate approaches. And track and overhead work between Ingatestone and Shenfield. Those of us who commute on the main line are looking worriedly at the three separate sets of works and wondering just how long they'll over-run... Martin D. Pay Who doubts that mainline services will be running normally by 2 January, when we all go back to work... |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Heathrow's new Terminal 2 opened this morning | London Transport | |||
DLR Canning Town Stratford International - still not opened ... | London Transport | |||
BBC: Doors opened on moving Victoria Line Tube near Brixton | London Transport | |||
Which railway line would you like to see re-opened if money wasno object? | London Transport | |||
New motorway opened in Cricklewood | London Transport |