Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 14 Dec, 18:57, Dave A wrote:
Mizter T wrote: (snip) What I haven't got my head round is the exact reasoning behind the South London Line being chucked out of London Bridge. I guess it occupies a valuable platform, which is space that is much needed. I'm unclear as to whether this space is needed permanently for Thameslink '2000' or whether it is just needed for the duration of construction works... I thought it was the latter, but perhaps it's the former. The rebuilt London bridge will have fewer terminal platforms in favour of more through platforms. Dave I presumed it would be something like that - indeed if I'd just read your website's entry on the Thameslink Programme... http://www.alwaystouchout.com/project/23 ....I'd have known that the London Bridge redevelopment masterplan "involves increasing the number of through platforms from 6 to 9, and decreasing the number of terminating platforms from 9 to 6." |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New LO in car line diagram for ELLX Phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
Crossrail & ELLX going ahead | London Transport |