Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#13
![]() |
|||
|
|||
![]()
On Sun, 30 Dec 2007 17:50:05 -0000, Peter Smyth wrote:
I was just thinking that Hackney Central might be a good place to terminate trains from the GEML, routing them via Stratford, while Liverpool Street is closed. But of course, there are still works at Shenfield that mean they can't even get to Stratford. And it wouldn't really be a very good idea anyway. Fenchurch Street would be a better idea (using the connection from Stratford). But even with over a year to organise it, it hasn't happened. The problem with that is Fenchurch Street only has 4 platforms so doesn't have the capacity to take One trains as well as the c2c trains. Come on! How many platforms at Fenchurch St does the C2C service require at this time of year? Two? c2c are running a normal offpeak service (8tph) but with fewer peak trains. The other problem is that the link between Stratford and Fenchurch Street is only single track. Though the single track presumably has a capacity greater than 0tph. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Sense seen on Crossrail at last? | London Transport | |||
[OT] Mysteries seen from the air | London Transport | |||
Gunnersbury 9-day Blockade | London Transport | |||
Blockade of cross London Thameslink services from Saturday 11th September 2004 until 2005 | London Transport | |||
Just Seen bendibus now on 73 | London Transport |