Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
For the last 2 -3 months there has been building work at the Northern end of
the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? |
#2
![]() |
|||
|
|||
![]()
On Feb 11, 9:19 am, "Sam" wrote:
For the last 2 -3 months there has been building work at the Northern end of the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? Is it lifts? |
#3
![]() |
|||
|
|||
![]() "Offramp" wrote in message ... On Feb 11, 9:19 am, "Sam" wrote: For the last 2 -3 months there has been building work at the Northern end of the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? Is it lifts? No - the exit is at the southern end of the station |
#4
![]() |
|||
|
|||
![]() "Sam" wrote in message ... "Offramp" wrote in message ... On Feb 11, 9:19 am, "Sam" wrote: For the last 2 -3 months there has been building work at the Northern end of the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? Is it lifts? No - the exit is at the southern end of the station Must be aTesco Metro then :-) |
#5
![]() |
|||
|
|||
![]()
On 11 Feb, 09:19, "Sam" wrote:
For the last 2 -3 months there has been building work at the Northern end of the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? Almost certainly a new SER (signal equipment room) building for the forthcoming resignalling of the Northern Line by Tube Lines/Thales. |
#6
![]() |
|||
|
|||
![]() "BRB Class 465" wrote in message ... On 11 Feb, 09:19, "Sam" wrote: For the last 2 -3 months there has been building work at the Northern end of the Northbound platform at Totteridge and Whetstone station. Does anyone know what it is ? Almost certainly a new SER (signal equipment room) building for the forthcoming resignalling of the Northern Line by Tube Lines/Thales. Can't be, Tubelines doing some enabling work before it is actually required instead of waiting until it is late. And then bollocking the signalling contractor. Kevin |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Route & Ticket info : Whetstone - East Croydon | London Transport | |||
Platform building at Paddington (Praed Street) | London Transport | |||
Totteridge Ground Frame | London Transport | |||
Totteridge & Whetstone / Oakleigh Park BR | London Transport | |||
Totteridge & Whetstone / Oakleigh Park BR | London Transport |