Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#16
![]() |
|||
|
|||
![]()
On 19 May, 09:55, Paul Corfield wrote:
On Mon, 19 May 2008 00:22:29 +0100, "Tim Roll-Pickering" wrote: Paul Corfield wrote: The most surprising (to me) aspect is how busy Sunday services are - I've been out most Sundays recently and many buses are full or near to full which is a big turn round from about 10 years ago when demand was much lower. Sometimes too full - how often are Sunday services reviewed and potentially expanded? The standard TfL answer is that routes are reviewed every 5 years about 18 months before they are retendered or considered for contract extension (if performance has been good). *This is certainly the answer I have had from TfL when corresponding with them about my local services. When routes are retendered then some will get improved frequencies while a 2 year "good performance" extension also triggers frequency improvements and these are typically Evenings and Sundays. Service enhancements can occur independently of that cycle and I would guess that it is the result of surveys, operator or passenger feedback or review of performance information. *If routes are chronically overloaded then their performance would fall. Oyster and ticket machine data is another source of info too. One particular problem I've seen is the over reliance on existing bus routes to double as rail replacement services. The Central Line betwen Mile End and Stratford is the most obvious case in my normal routine and often I've found the 25 ridiculously crowded (even by its standards) and insufficiently frequent when there's no tube between those points. I agree that the current extent of weekend engineering works is leading to diversion to bus services. The current Victoria Line closures at weekends either stop me using the tube altogether or else I transfer to the bus. *I'm not a great enthusiast for the limited rail replacement services that operate. *You cite the 25 as an example but the 25 has been awful for years no matter what day of the week. I remain amazed that it is as busy as it is given that it is duplicated over its length by other rail and bus routes. *The Sunday 25 has recently been increased in frequency in an attempt to cope - it had a temporary enhancement between Aldgate and Stratford for a few months. *Whether TfL will agree to increase the main service on M-S using spare former route 453 buses will be interesting - will Boris allow it!? The 25 is now the only route along stretches that used to be covered by two or three overlapping routes such as the 86 and the 10, which must have taken a lot of pressure off it, given that not everyone goes all the way from Ilford to Oxford Circus. I am not completely clear how all the rationalisation has worked in terms of total capacity. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Street Types site | London Transport | |||
Bus Use in London Emergency | London Transport | |||
Anyone here use bus route 100 regularly? | London Transport | |||
Service Distribution To Terminal Points | London Transport | |||
Bus stop sign covered and marked 'not in use' and a temporary bus stop sign right next to it | London Transport |