Roland Perry wrote:
In message , at 11:58:08 on Mon, 2 Jun 2008, Mizter T remarked: Can anyone say exactly how long this station took to be built - i.e. from the start the proper construction phase? It's certainly been fairly rapid - well under a year. It would be interesting to know. East Midlands Parkeway, which is supposed to be open in December, is currently just a load of mud. It may have some foundations, or it may not, it's difficult to see, through the mud. Mr Thant's blog reckons about 5 months for the build phase? http://londonconnections.blogspot.co...ulse-hill.html Paul |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tramlink doubling - Mitcham to Mitcham Junction | London Transport | |||
Mitcham Eastfields | London Transport | |||
Mitcham Eastfields | London Transport | |||
Eastfields Station ? | London Transport | |||
Eastfields Level Crossing | London Transport |