London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #4   Report Post  
Old June 2nd 08, 08:34 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default New Cross Gate Query


On 2 Jun, 21:17, " wrote:

On 2 Jun, 17:32, Mizter T wrote:

The Railway Herald is wrong and you are right - you can deduce this
from the ground without even needing to look at any plans. A new
junction has already gone in on the down slow mainline south of NXG,
this can be seen from a train obviously but also the top deck of any
bus that traverses New Cross (the road) - the existing platform will
thus be reused.


Will the tracks linking the ELL and the District (St.Mary's curve) be
removed?


I believe it's gone already.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Cross Gate to Shepherd's Bush via Crystal Palace Dr. Sunil London Transport 12 May 29th 10 02:18 PM
New Cross gate to West Croydon/Crystal Palace ce07 London Transport 2 October 4th 09 07:38 PM
New Cross Gate Oyster MIG London Transport 2 September 4th 09 11:17 AM
Work at New Cross Gate Underground platform The Only Living Boy in New Cross London Transport 3 February 9th 05 01:45 PM
Work at New Cross Gate Underground platform Martin J London Transport 2 February 7th 05 09:42 PM


All times are GMT. The time now is 08:24 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017