Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]() On 4 Jun, 20:44, wrote: "Mr Thant" wrote: It wouldn't be very useful. The interim arrangement is more about having somewhere to send the peak services from the north with the Moorgate branch gone. There's not really anywhere to terminate them, so running them through as services to Kent (replacing the SET Blackfriars services) is the only real option. It's being shut. The platforms at Farringdon can't be extended to 12- car length without fouling the junction towards Moorgate, so the branch will be closed. There are various suggestions here and elsewhere about the alignment being used for stabling LU trains given that it's adjacent to the Met/ Circle/H&C, though nothing official. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
6 Thameslink services to avoid after March 2009 | London Transport | |||
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 | London Transport | |||
SET 376 - A big disappointment | London Transport | |||
376 diagrams on SET website | London Transport | |||
LUL set to close Met line | London Transport |