London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old June 6th 08, 07:33 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2006
Posts: 130
Default Blackfriars - SET services after December 2008

Rupert Candy wrote:

I presume we (for I am one) are to get the entirely unrefurbished
319/0s, rather than the pink and purple reasonably-well-refurbished
examples.


Knowing how often 319/(0,3)s do Bedford-Brighton and 319/4s Luton/St
Albans-Wimbledon Loop (because of diagramming constraints), you'll
probably ride a non-319/0 every now and again. Or perhaps even
semi-regularly if FCC *plan* to share the 319/(0,3)s between Wimbledon
Loop and 7oaks services, which I don't think is unlikely - but I expect
thy'll try to restrict the former Brighton Express trains (319/2s)
to...er...Brighton services.

FCC will refresh all the 319s but as the C6 exams are carried out at the
same time it will be a few more years before they are all refreshed - to
date well over 20 319/4s have been worked on since September 2006, which
leaves about another 60-odd 319s to do.

Unless I'm mistaken the 319/(0,2)s underwent their C6 exams back in
2006/2007 so they will be refreshed last (possibly alongside the 319/4s
that were merely repainted).

Though the Notworkers are still in 'as built' condition
internally (albeit 'refreshed'), and look pretty dingy and tired
compared to other older (but modernised) stock like 455s.


Some of the 465/2s were [refreshed/refurbished]* and renumbered as
465/9s weren't they? I don't know if any of the other Networkers have
been altered though.


*Delete as appropriate
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
6 Thameslink services to avoid after March 2009 Sky Rider London Transport 0 October 31st 08 04:53 PM
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 burkey London Transport 0 February 24th 07 12:35 AM
SET 376 - A big disappointment Rich Mallard London Transport 36 February 24th 05 12:41 PM
376 diagrams on SET website Rupert Candy London Transport 0 October 15th 04 10:16 AM
LUL set to close Met line daveb London Transport 19 February 16th 04 04:15 PM


All times are GMT. The time now is 08:18 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017