London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old August 7th 08, 03:15 PM posted to uk.railway,uk.transport.london
MIG MIG is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2004
Posts: 3,154
Default Blackfriars closure

On 7 Aug, 15:17, "Mortimer" wrote:
"Paul Scott" wrote in message

...







wrote in message
....
On Aug 7, 1:48 am, " wrote:
On 6 Aug, 22:55, darkprince66 wrote:


10 minutes walk? To the nearest tube station? Gasps in horror... You
poor darlings ;-)


I know, that was my reaction. If we weren't spoiled we wouldn't be so
worried. Chancery Lane, Holborn etc aren't far. By the standards of
many towns and cities, Waterloo isn't far.


Francis


True, but it still makes you wonder how _necessary_ the closure really
is. *As far as I recall, the works are to extend the platforms (to the
south bank) and create four through ones instead of two through and
three bays - I'm sure someone _could_ work out a way to do this
leaving one platform open each time (even if Northbound only or
whatever).


Er.. you've completely missed the point here - the news is about the long
term closure (two and a half years) of the LU platforms, not the
Thameslink ones.


Interesting: I'd thought that it was the Thameslink platforms as well.

What are they doing to the LU platforms and access that will take 2½ years?
Obviously it's not track related if trains can still run through non-stop..



Given what happened at Bank ...

I bet there's just one passageway closed or something, which the
dubious simulation software they must be using has calculated to
result in thousands of deaths through overcrowding unless they close
the whole station.

Let's hope that they don't apply the same simulations to stations that
aren't having any work done, or they might realise that they have to
close all of them.
  #2   Report Post  
Old August 7th 08, 03:28 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Blackfriars closure

MIG wrote:

Given what happened at Bank ...

I bet there's just one passageway closed or something, which the
dubious simulation software they must be using has calculated to
result in thousands of deaths through overcrowding unless they close
the whole station.


I guess you've just read Sky Rider's post by now, saved me looking it up,
cheers

:-)

Paul



  #3   Report Post  
Old August 9th 08, 11:07 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2006
Posts: 130
Default Blackfriars closure

Paul Scott wrote:

cheers

:-)


You're welcome.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Blackfriars Railway Bridge SteveTBM® London Transport 16 November 12th 06 08:28 PM
Thameslink 2000 Blackfriars [email protected] London Transport 39 August 16th 05 02:05 PM
Thameslink northbound service to Blackfriars this morning (Fri 25th Feb) Martin J London Transport 3 February 25th 05 10:39 PM
Thameslink to close Between Kentish Town & Blackfriars Colin Rosenstiel London Transport 4 August 23rd 03 06:49 PM
Thameslink to close Between Kentish Town & Blackfriars Nick Lawford London Transport 0 August 21st 03 09:21 PM


All times are GMT. The time now is 06:35 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017