London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #19   Report Post  
Old September 18th 08, 12:09 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default NLL Camden Road work package reduced

On 17 Sep, 06:25, Jamie Thompson wrote:
Given the works to be/being performed to enlarge the Hampstead tunnel
and bridges on the Gospel Oak routes to enable more freight to reach
the WCML without crossing the GEML or using the NLL,


This only applies to freight from the Tilbury direction. The NLL is
still going to be the most practical route for GEML freight. See the
diagram he
http://londonconnections.blogspot.co...on-is-for.html

A lot of other current NLL traffic could not easily be diverted away.
We're a long way from it being a segregated passenger route.

U
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
NLL work brought forward - DfT Paul Scott London Transport 4 November 26th 08 12:08 PM
Camden Road - London Overground Mwmbwls London Transport 24 November 29th 07 12:43 AM
Holloway Road Tube Work Ernst S Blofeld London Transport 16 December 18th 06 11:28 PM
Greatly reduced rail acess to Enfield over the weekend david cockle London Transport 15 October 3rd 05 09:08 PM
Camden Town derailment - reduced refunds? tony lees London Transport 0 December 18th 03 02:04 PM


All times are GMT. The time now is 08:31 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017