Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On 20 Oct, 12:30, D7666 wrote:
Don't forget these are long 12 car trains running into or out of the SPILL station stop - and all trains will stop - they ain't going to be high speed across the convergence point. But what do you gain by moving the junction to south of the station? The only net effect is a longer allowable dwell time as trains will be able to do some of their waiting (to cross the junction) in a platform rather than in the tunnel to the north. So there's only a need for more than two platforms if you think the dwell time allowed by 24 tph through each platform won't be acceptable, which you could say about all of the central stations. In other words, the junction is irrelevant. U |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport | |||
Thameslink 2000 and other animals | London Transport | |||
Thameslink 2000 | London Transport | |||
THAMESLINK 2000 | London Transport | |||
New Thameslink 2000 proposals? | London Transport |