Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
The reason given last night for the closure of Bank DLR station was
faulty ventilation equipment in one of the tunnels between Shadwell and Bank. I assumed it was the same problem this morning. Bank DLR is closed all too often these days which is a pain while Tower Gateway is closed and there is no East London Line from Shadwell. This evening, dodgy signals were to blame for the fact they were running a shuttle between Lewisham and Cutty Sark and between Cutty Sark and Bank. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
"How long are the delays?" | London Transport | |||
Delays on 8 & 9 December | London Transport | |||
Underground delays = online delays | London Transport | |||
Central line delays? | London Transport | |||
Compensation For Delays | London Transport |