Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]() "MIG" wrote in message ... On 13 Nov, 16:55, "Paul Scott" wrote: I guess quite a few will be interested in the Southern stopping patterns on the WLL after December 14th, the TT includes times for the Milton Keynes service from 26th Jan, as well as the London Overground services: http://www.southernrailway.com/routes.php?r=5&m=route 6 separate files at bottom of page, unfortunately... Have I missed something? The TSO "UK" Rail Timetable table 66 shows Southern trains running through to Milton Keynes both "until 23 January" and "from 26 January". Table 177 has only one version and shows the ones that run from Croydon. The TSO UKRT probably predates the decision not to commence the full service til 26 Jan, which is clearly shown in both the SN (link above) and LM pdf timetables. http://londonmidland.go-cms.co.uk/app/webroot/files/cache/LM08D_BOOK1_GRIDS_WEB.pdf The LM terminating service to MK is also shortened to Bletchley during December, because firstly they are still altering the reversing platform at MK, ie swapping the Up slow line (P2) and original bay (P1), to allow trains to terminate in the centre road; and secondly altering the track and connecting a second 4 car bay (2B) cut out of the south end of platform 1. Presumably this new second bay isn't needed for the LM services, but it may still not be ready until late Jan, thereby delaying SN starting. http://londonmidland.go-cms.co.uk/ap...0%20versionpdf http://londonmidland.go-cms.co.uk/in...version_id=200 Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Northern line timetable changes | London Transport | |||
North London Line revised timetable | London Transport | |||
Central Line Timetable | London Transport | |||
Northern Line Timetable 48 | London Transport |