London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old December 2nd 08, 11:15 PM posted to uk.railway,uk.transport.london
No Name
 
Posts: n/a
Default Bakerloo Line beyond Harrow & Wealdstone

"Clive D. W. Feather" wrote in message
...
In article
, Neil
Williams writes
Might it be easier to fit CCTV to the train rather than the platform?


You still need to fit the cameras and the wiring. All it saves is the cost
of the monitors, but at the expense of a transmission system.

The Northern and Central Lines have this, but that's mostly because
there's no room to retro-fit the monitors in tube stations.


Less infrastructure and less cost?



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Harrow & Wealdstone lifts Walter Briscoe London Transport 3 August 8th 11 06:01 PM
Harrow & Wealdstone this morning! [email protected] London Transport 6 June 2nd 09 10:03 AM
Bakerloo Line beyond Harrow & Wealdstone 1506 London Transport 1 December 18th 08 04:44 PM
Bakerloo Line beyond Harrow & Wealdstone No Name London Transport 0 November 25th 08 06:33 PM
Harrow & Wealdstone platforms Marratxi London Transport 3 May 15th 05 10:48 PM


All times are GMT. The time now is 01:55 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017