Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]() "Peter Campbell Smith" wrote I was involved in specifying the video transmission system for the Central Line, and the rationale given at the time was that they wanted (or maybe were required) to allow the driver to see the images after moving off. This RAIB report explains why. http://www.raib.gov.uk/cms_resources...g_Broadway.pdf In this case, the train operator was apparently too concerned about checking signal aspects (he'd been involved in a previous SPAD) that he didn't notice in the monitor that the passenger was being dragged along the platform. Peter |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Harrow & Wealdstone lifts | London Transport | |||
Harrow & Wealdstone this morning! | London Transport | |||
Bakerloo Line beyond Harrow & Wealdstone | London Transport | |||
Bakerloo Line beyond Harrow & Wealdstone | London Transport | |||
Harrow & Wealdstone platforms | London Transport |