London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old December 3rd 08, 07:14 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,796
Default Bakerloo Line beyond Harrow & Wealdstone

On Wed, 3 Dec 2008 12:57:10 -0000, wrote:

Hamburg also has an on-board system for platform monitoring.


Indeed. It was the introduction of this on the S-Bahn in 2000 (the
U-Bahn had had it for years, though not at all stations) that finally
did away with the charming old tungsten-lit pre-war EMUs.

Neil

--
Neil Williams
Put my first name before the at to reply.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Harrow & Wealdstone lifts Walter Briscoe London Transport 3 August 8th 11 06:01 PM
Harrow & Wealdstone this morning! [email protected] London Transport 6 June 2nd 09 10:03 AM
Bakerloo Line beyond Harrow & Wealdstone 1506 London Transport 1 December 18th 08 04:44 PM
Bakerloo Line beyond Harrow & Wealdstone No Name London Transport 0 November 25th 08 06:33 PM
Harrow & Wealdstone platforms Marratxi London Transport 3 May 15th 05 10:48 PM


All times are GMT. The time now is 01:55 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017