London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #20   Report Post  
Old December 18th 08, 12:01 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Bakerloo Line beyond Harrow & Wealdstone

On Dec 18, 12:19*am, MIG wrote:
On Dec 17, 10:13*pm, Christopher A. Lee wrote:





On Wed, 17 Dec 2008 22:00:51 +0000, asdf
wrote:


On Tue, 2 Dec 2008 13:03:35 -0800 (PST), D7666 wrote:


I'm probably wrong but I thought mirrors are an aid to driver to see
guard but DOO needs CCTV ?


DOO requires a clear view of the entire side of the train. This can be
done through mirrors, CCTV, or a combination.


Thinking more on this since I made that comment perhaps my involvement
with underground infrastructure has confused me ... perhaps we have a
CCTV requirement that national railways do not.


IIRC, the NR platforms at Harrow-on-the-Hill only have mirrors. The
north/westbound NR platform is occasionally used by Amersham-bound LU
trains.


Do they stop there these days? When I lived in Harrow it was the
through line for trains that didn't stop.


There was the famous occasion when the signalman thought the Master
Cutler was a Uxbridge fast and routed it down the line to West Harrow.
I never did find out how they got it back on the main line.


Don't all LU trains stop at Harrow on the Hill? *Last time I got an
Amersham-bound LU train I was slightly surprised that it used platform
1 at HoTH, which I expected to be used mainly by Chiltern when they
stopped. *However, it had stopped at Wembley Park in platform 1 as
well, where I got on (still requiring a crossover to get to platform 1
at HoTH).

I put both down to changed patterns in the many years since I had been
that way before. *Firstly, you now get fast plus Wembley Park (where
stopping at Wembley Park used to be only done by the extra stopping
Amershams that ran on Sundays) and secondly, all Metropolitans seemed
to cross after HoTH rather than before. *It does make sense to group
Chiltern and LU fast Amershams in the same platform though.


Northbound platforming at HotH is normally Plat 1 for Chiltern, 3 for
Watford or Amersham and 4 for Uxbridge. During the peak there are
several occasions when a NB Amersham and a NB Watford are due at
Harrow at the same time. These are the northbound Amersham trains that
will generally use Platform 1.

I've still not quite worked out the rationale behind the Wembley Park
stops during the peak, as the pattern seems a bit inconsistent for the
'fast' services. It might have to do with crewe changes though.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Harrow & Wealdstone lifts Walter Briscoe London Transport 3 August 8th 11 06:01 PM
Harrow & Wealdstone this morning! [email protected] London Transport 6 June 2nd 09 10:03 AM
Bakerloo Line beyond Harrow & Wealdstone 1506 London Transport 1 December 18th 08 04:44 PM
Bakerloo Line beyond Harrow & Wealdstone No Name London Transport 0 November 25th 08 06:33 PM
Harrow & Wealdstone platforms Marratxi London Transport 3 May 15th 05 10:48 PM


All times are GMT. The time now is 03:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017