Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
On Feb 24, 5:35*am, "Paul Scott"
wrote: http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... Paul S This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto routes with other safety systems (AWS), and none. Dealing with failsafe and reliability will surely be a challenge. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
NLL Infrastructure specification agreed | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport |