Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
This talk about Thameslink ATO got me thinking - the Jubilee line was
closed over the festive season - was this something to do with ATO. If so, does that mean ATO is now up-and-running on the Jubilee? If so, then have there been any noticeable improvement in speeeds - I always seem to remember trains crawling into stations - particularly those with Platform Edge Doors - and there always seemed to be a lag between the train stopping and doors opening. Would be interesting to hear if it's up and running if much is different. Regards, Joe |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Jubilee Line ATO | London Transport | |||
Jubilee Line ATO | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport |